Completing The Test - ABB ProtectIT REL 551 2.5 Installation And Commissioning Manual

Differential protection terminal
Hide thumbs Also See for ProtectIT REL 551 2.5:
Table of Contents

Advertisement

25.2
Definite time non-directional overcurrent
protection (TOC)
4.
Compare the measured operating current with the set value IN>.
5.
Set the fault current to about 1.5 times the measured operating cur-
rent.
6.
Switch on the fault current and measure the operating time of the
TOC protection. Use the TOC--TRN signal.
7.
Compare the measured time with the set value tN.

Completing the test

Continue to test another function or complete the test by setting the test mode to off.
Chapter 13
Verifying settings by secondary
injection
145

Advertisement

Table of Contents
loading

Table of Contents