System Start-Up - Ispring PH100 Installation Instructions & Owner's Manual

Table of Contents

Advertisement

Make sure ALL the tubing are connected to the correct locations.
Double-check the security of all connections BEFORE TURNING ON the
water supply. See the following checklist.
A. ) The faucet tubing connects to the post carbon inline filter (5
One end of the inline filter is marked "connect to faucet."
B. ) The feed water tubing connects to the 1
C. ) The storage tank tubing connects to the other end of the post carbon
th
inline filter (5
D. ) The wastewater tubing from the drain saddle connects to the flow
iSpring Water Systems
restrictor.

System Start-Up

stage) at the union tee fitting. (3/8" white tubing)
th
st
stage of the unit.
stage).
Page 14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ro100

Table of Contents