Index Page Please note: Safety Instructions......3 Current operating instructions are also available via 1.1. For Your Orientation ......... 3 www.pfeiffer-vacuum.net. 1.2. Pictogram Definition ......... 3 Understanding The Pumps .... 4 2.1. Main Features........... 4 Proper Use ..............4 Improper Use ............4 2.2.
1. Safety Instructions ☞ Read and follow all instructions in this manual 1.2. Pictogram Definition ☞ Inform yourself regarding: – Hazards with respect to the pump. Danger of burns from touching hot parts WARNING – Hazards with respect to your system. –...
90 Operating fluid return unit – Accessories other than those named in this manual may 140 Operating fluid filler screw only be used with the agreement of Pfeiffer Vacuum. 142 Operating fluid drain screw 250 Motor, Improper Use –...
3. Installation 3.1. Preparations For Installation Expelled gases and vapours can represent a CAUTION health hazard and/or be damaging to the Do not carry out any unauthorized conversions environment. The local safety regulations must WARNING or modifications to the rotary vane vacuum be observed.
In this case please get in touch with your local Pfeiffer Vacuum Service (please refer to Section 7). Protect pump by means of suitable measures CAUTION (e.g.
4.2.1. Permissible Operating Duration O O p p e e r r a a t t i i o o n n m m o o d d e e c c o o n n t t i i n n u u o o u u s s i i n n t t e e r r v v a a l l l l (max.
Leak in the system Repair leak. Unusual operating noises Damage to the pump system Request repair by Pfeiffer Vacuum Service. Damage to the coupling part Request repair by Pfeiffer Vacuum Service. Operating fluid is leaking out from under the pump Defective radial shaft seals Request repair by Pfeiffer Vacuum Service.
The disposal of used operating fluid must be carried in accor- dance with the respective local regulations. Please request safety instruction data sheets for operating fluids from Pfeiffer Vacuum or download from the INTRANET/ INTERNET. ➡ Depending on the process, change the operating fluid every 500-2000 operating hours, but at least once every 6 months.
6.2. Changing The Exhaust Filter 6.3. Changing The Intake Filter Exhaust filter 120 in operating fluid separator 75 should be The intake filter, located in the upper part of the intake flange replaced, depending on the application and level of contami- must be cleaned when the intake capacity reduces.
➡ A copy of the completed declaration must accompany the unit; any additional copies must be sent to your local Pfeif- fer Vacuum Service Center. Please get in touch with your local Pfeiffer Vacuum represen- tatives if there are any questions regarding contamination. Decontaminate units before returning or possi- WARNING ble disposal.
8. Technical Data Feature Unit Pump UNO 6 Connection nominal diameter Input DN 1 DN 16 ISO-KF mit G 3/8” inner thread Output DN 2 G 3/8” hose coupling ø 12 Flow rate at m 3 /h 50 Hz Final pressure Total without gas ballast mbar <...
9. Accessories Description Type Size Order No. Comments Operating fluid PK005 875-T Operating fluid PK005 876-T Operating fluid PK005 877-T standard Adapter for the exhaust connection G 3 / 8 auf DN 16 ISO-KF PK 101 002 Dust separator SAS 20 Rp 1/2”...
10. Spare Parts Spare parts packages for UNO 6 Set of seals UNO 6, PK E50 002 -T Pos. Description Size Required Comments pieces/pump O-ring 73 x 3 O-ring 24,5 x 3 O-ring 15 x 2 Copper seal 6 x 10 x 1 O-ring 18 x 5 O-ring...
Page 15
Pfeiffer Vacuum. repairs. Unapproved changes by the customer void all warranty and liability claims against Pfeiffer Vacuum. Please use our Service Training offers (informa- PLEASE NOTE When ordering accessories and spare parts please be sure to tion is also available via state the full part number.
Declaration of Contamination of Vacuum Equipment and Components The repair and/or service of vacuum components will only be The manufacturer could refuse to accept any equipment carried out if a correctly completed declaration has been without a declaration. submitted. Non-completion will result in delay. This declaration can only be completed and signed by authorised and qualified staff: 1.
EN ISO 12100-1 EN 60335-1, -41 EN ISO 12100-2 EN 61 010 EN 294 EN 1012-2 EN 50 081-1 EN 50 082-2 Unterschriften/Signatures: Pfeiffer Vacuum GmbH Berliner Str. 43 Unterschriften: 35614 Asslar Germany (M. Bender) (Dr. M. Wiemer) Geschäftsführer Geschäftsführer...
Page 18
Roots pumps Dry compressing pumps Leak detectors Valves Components and feedthroughs Vacuum measurement Gas analysis System engineering Service Pfeiffer Vacuum Technology AG · Headquarters/Germany Tel. +49-(0) 64 41-8 02-0 · Fax +49-(0) 64 41-8 02-2 02 · info@pfeiffer-vacuum.de · www.pfeiffer-vacuum.net...
Need help?
Do you have a question about the UnoLine UNO 6 and is the answer not in the manual?
Questions and answers