Pfeiffer Vacuum UNO 005 A Operating Instructions Manual
Pfeiffer Vacuum UNO 005 A Operating Instructions Manual

Pfeiffer Vacuum UNO 005 A Operating Instructions Manual

Rotary vane vacuum pumps

Advertisement

Operating Instructions
UNO 005 A
UNO/DUO 2.5 A
UNO/DUO 2.5 AC
Rotary Vane Vacuum Pumps
PK 800 152 BGB/F (9911)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UNO 005 A and is the answer not in the manual?

Questions and answers

Summary of Contents for Pfeiffer Vacuum UNO 005 A

  • Page 1 Operating Instructions UNO 005 A UNO/DUO 2.5 A UNO/DUO 2.5 AC Rotary Vane Vacuum Pumps PK 800 152 BGB/F (9911)
  • Page 2: Table Of Contents

    INDEX Page Page 4.5. Gas Ballast Valve (For Corrosive Gas Processes)..7 1. Safety Precautions........2 1.1. For Your Orientation............2 4.6. Silencer................7 2. Understanding The Pump ....... 3 5. What To Do In Case Of Breakdowns? ... 8 2.1.
  • Page 3: Understanding The Pump

    2. Understanding The Pump 2.1. Main Features 2.2. Design The single stage UNO 005 A/2.5 A and two stage Rotary Vane Vacuum Pumps DUO 2.5 A/AC Rotary Vane Vacuum Pumps are oil-immersed. The pump stages and motor are mounted on a support stand.
  • Page 4: Installation

    3. Installation 3.1. Preparations For Installation 3.4. Connecting The Exhaust Side Fill up with operating fluid before operating the Pressure can rise to dangerous levels in exhaust first time (included in a separate pack in the lines. Therefore exhaust lines should not be delivery consignment).
  • Page 5: Connecting To The Mains Power Supply

    – The single phase drive motors of the UNO 005 A/2.5 A and the DUO 2.5 A/AC are fitted with a built-in thermal protection switch. A cable with connecting plug is fitted to the motor for mains connection purposes.
  • Page 6: Operations

    4. Operations – In non-stop operations check operating fluid daily, Rotary Vane Vacuum Pumps UNO 005 A/2.5 A, DUO 2.5 A/AC otherwise whenever the pump is switched on; Vacuum connection Support stand topping up pump fluid is possible when the pump is in...
  • Page 7: Gas Ballast Valve (Standard Version)

    To avoid condensation in the pump, vapours 4.5. Gas Ballast Valve (For Corrosive Gas should only be pumped off when the pump is Processes) warm and with gas ballast valve open. Note Gas ballast valve 7 is equipped with a dosing unit 7.3 and a pump water vapour compatibility levels under flushing gas connection 7.4.
  • Page 8: What To Do In Case Of Breakdowns

    5. What To Do In The Case Of Breakdowns? Problem Possible Cause Remedy Pump doesn't attain final pressure • Pump dirty • Clean the pump • Operating fluid dirty • Operate pump for a longer period with open gas ballast valve or change operating fluid •...
  • Page 9: Shutting Down For Longer Periods

    ➡ Fill up pump with fresh operating fluid: filling level - upper 6.2. Shutting Down For Longer Periods end of sight glass 5. Should the pump have to be shut down for an longer period, If this amount of operating fluid is filled in, the level is the complete pumping system must be adequately protected extremely high but this is necessary to protect all parts of the against corrosion.
  • Page 10: Technical Data

    8. Technical Data Single Stage UNO 005 A UNO 2.5 A Two Stage DUO 2.5 A/AC Connection nominal diameter Input DN 16 ISO-KF DN 16 ISO-KF DN 16 ISO-KF Output DN 16 ISO-KF DN 16 ISO-KF DN 16 ISO-KF Nominal volume flow rate at...
  • Page 11: Dimensions

    8.1. Dimensions UNO 005 A UNO/DUO 2.5 A UNO/DUO 2.5 AC 9. Accessories Oil Mist Separator ONF 010 can be fitted to the exhaust port with the help of a reducing ring of the Rotary Vane Vacuum Pumps to prevent the expelled operating fluid mist polluting the air.
  • Page 12: Spare Parts

    10. Spare parts Spare parts UNO 005 A, Standard version Spare parts UNO/DUO 2.5 A, Standard version Pos. Description Pieces Size Number Comments Order Quantity Set of seals, UNO 005 A PK 194 512-T Set of seals, UNO/DUO 2.5 A...
  • Page 13: Declaration Of Contamination

    Declaration of Contamination of Vacuum Equipment and Components The repair and/or service of vacuum components will only be The manufacturer could refuse to accept any equipment carried out if a correctly completed declaration has been without a declaration. submitted. Non-completion will result in delay. This declaration can only be completed and signed by authorised and qualified staff: 1.
  • Page 14 ➪ D D Pfeiffer Vacuum GmbH Konformitätserklärung im Sinne folgender EU-Richtlinien: - Maschinen 89/392/EWG Emmeliusstr. 33 - Elektromagnetische Verträglichkeit 89/336/EWG D-35614 Asslar - Niederspannung 73/23/EWG Hiermit erklären wir, daß das unten aufgeführte Produkt den Bestimmungen der EU-Maschinenrichtlinie 89/392/EWG - Anhang IIA, der EU-Richtlinie über elektromagnetische Verträglichkeit 89/336/EWG und der EU-Niederspannungsrichtlinie 73/23/EWG entspricht.
  • Page 15 73/23/CEE. Abaixo, dá-se indicação das directivas aplicadas, das normas harmonizadas e das normas e especificações aplicades no respectivo país. ➪ G G Produkt/Product/Produit/Prodotto/Producto/Produkt/Produkt/Produto/ UNO 005 A UNO/DUO 2.5 A UNO/DUO 2.5 AC Angewendete Richtlinien, harmonisierte Normen und angewendete, nationale Normen in Sprachen und Spezifikationen: Guidelines, harmonised standards, national standards in languages and specifications which have been applied: Les directives appliquées, normes harmonisées et les normes nationales appliquées en langues et spécifications:...
  • Page 16 18th Floor, Chokchail Intíl Bldg. Korea Assistencia Técnica e Representação S/C Ltda. 690 Sukhumvit Road Rua Bernadino de Compos, 551 Pfeiffer Vacuum Korea Ltd., 3F Haein Building 453, Klongton, Klongtoey CEP 04620-002 São Paulo, SP - Brasil Dokok-Dong, Kang Nam-Ku, Seoul, 135-270 Bangkok 10110...

This manual is also suitable for:

Duo 2.5 acUno 2.5 aDuo 2.5 aUno 2.5 ac

Table of Contents