Installing The Gas Piping For Circuit Breaker With One Density Monitor (Standard Configuration) - GE GL 311 F3/4031 P/VE Operating Instructions Manual

High voltage circuit breaker
Hide thumbs Also See for GL 311 F3/4031 P/VE:
Table of Contents

Advertisement

7.2.1
Installing the Gas Piping for Circuit Breaker with One Density Monitor
(Standard Configuration)
REV7
/REV6
We recommend that the following tools be used to connect the gas
couplings:
- T022:
Compact open-end wrench (open-ended spanner),
SW27
- WK001: Torque wrench (spanner) with ratchet adapter and
SW27 open-end wrench head
• Remove the protective caps from the gas couplings on the pole
columns and the gas piping.
• Lubricate O-ring (5) per L5 and slide it onto the sleeve (6) so that
it is centered.
• Insert the sleeve (6) with O-ring (5) in the screw-in connector (9).
• Apply locking adhesive to the external thread of the screw-in
connector (9) per L1.
• Insert the pieces of gas piping (2, 3 and 4) one after the other into
the respective screw-in connectors (9) and screw tight using
union nuts (7). Tighten to a torque of 30 Nm.
9
7
4
9
1
7
3
1
Filler block with density monitor and central sup-
ply connection
2
Gas piping for pole A
3
Gas piping for pole B
4
Gas piping for pole C
5
O-ring
6
Sleeve
7
Union nut
8
Filling connection
9
Screw-in connector
OI 250 (EN)
X
7
9
2
5
6
C
OMMISSIONING
8
X
1x
1x
1x
1x
3x
3x
3x
3x
3x