6

Installation

6.1

Preparing for Installation

6.1.1

Documentation

6.1.2

Checklist

REV7
/REV7
The following documents are required for installation and commis-
sioning and must be available at the installation site:
- Shipping documents
- Instruction manual with accompanying checklist
- Dimensioned drawing of the circuit breaker
- Schematic diagram of the circuit breaker
- Routine test certificate for the circuit breaker
The checklist is an essential supporting document for installation
and commissioning and is enclosed with this manual as a colored
sheet.
Performance of individual operations or steps must be confirmed
on the checklist. For some operations, measured values must also
be recorded.
A separate checklist must be filled out for each breaker, and after
commissioning it must be completed by filling in the date, name of
authorized individual, company stamp and signature (clearly legib-
le). A copy must be sent to the following address, indicating the
serial no. of the circuit breaker in the subject:
GE Grid GmbH
Service Germany
Lilienthalstrasse 150
34123 Kassel
Germany
Hotline: +49 1803 257866
Fax: +49 561 502-2774
e-mail: checkliste.kassel@alstom.com
The checklist is part of the warranty agreement between the cus-
tomer and GE Grid GmbH. In the event of a warranty claim, the
warranty claim may be reduced or declined if the completed
checklist is not on file at GE Grid GmbH.
OI 250 (EN)