A2.6 Locking Adhesives For Installation, Commissioning And Maintenance; A2.7 Measuring Devices For Checking Gas Quality - GE GL 311 F3/4031 P/VE Operating Instructions Manual

High voltage circuit breaker
Hide thumbs Also See for GL 311 F3/4031 P/VE:
Table of Contents

Advertisement

T
A
OOLS AND
UXILIARY
A2.6
Locking Adhesives for Installation, Commissioning and Maintenance
Abbre-
Name of Locking Adhe-
viation
sive
S1
Loctite 243
A2.7
Measuring Devices for Checking Gas Quality
Tool
T200
T201
T202
T203
122 / 146
E
QUIPMENT
The following table describes how locking adhesives are to be used
and applied. Each application is referred in the text of the instruc-
tion manual by its abbreviation (e.g.: locked per S1).
Function
Medium
readlocker
1)
The amounts required for installation and commissioning are sup-
plied by the manufacturer and are included in the breaker shipment.
Description
Dew point hygrometer
SF
analyzer, type AW
6
Acidity detector tube (10 each)
For use with T201
SF
volume percentage measuring device
6
OI 250 (EN)
Application
strength
th-
Apply a light coating of lok-
king adhesive to the first
few threads only. The cure
time is 30 minutes at room
temperature.
peratures require a longer
cure time
Illustration
Low
tem-
1)
REV7
/REV7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gl 312 f3/4031 p/ve

Table of Contents