Installation; Calibration - FILL-RITE 900 Series Installation And Operation Manual

Mechanical meter
Table of Contents

Advertisement

Available languages

Available languages

WARNING
To insure safe and proper operation of your equipment, it is critical to read and adhere
to all of the following safety warnings and precautions. Improper installation or use of
this product can cause serious bodily injury or death!
1. NEVER smoke near the meter, or use the meter near open ames when metering a
2. A "Fill-Rite" Filter should be used on the meter outlet to insure no foreign material is
3. Threaded pipe joints and connections should be sealed with the appropriate sealant
4. Storage tanks should be securely anchored to prevent shifting or tipping when full
5. To minimize static electricity build up, use only static wire conductive hose when
6. DO NOT exceed 50 psi/3.5 BARS line pressure.
7. DO NOT install additional foot valve or check valve without a pressure relief valve;

Installation

Meters are furnished for horizontal piping; left to right ow. Flow ports can
be changed to any of four positions for horizontal or vertical piping and for
either direction of ow.
1.
Determine direction for uid to ow.
2.
Install meter observing directional arrow on casting.
3.
Remove four screws (item 28).
4.
Rotate meter cover assembly (item 37) to desired orientation.
5.
Replace four screws (item 28).
CAUTION
Threaded pipe joints and connections should be sealed with the appropriate sealant or
sealant tape to minimize the possibility of leaks.
NOTICE
If you have purchased this meter as part of a "Kit", the
meter ange base is drilled with 4 holes. This allows
the meter to be used with 300 and 700 series pumps.
Line the meter bracket up for installation and insert the
bolts in the two holes that align with the corresponding
holes on the pump outlet. Once the meter bracket is
bolted securely in place install the two plugs in the
holes that were not used to prevent moisture from
entering them.

Calibration

The Fill-Rite Series 900 meters can be calibrated for either U.S. gallons or liters. Calibration is required upon installation,
after disassembly, after signicant wear or when metering a different viscosity uid. Depending on the model, Series 900
meters are factory calibrated in either U.S. gallons or liters using mineral spirit. Calibration must be done between 6 and
40 GPM (23 and 151 LPM). Meter calibration can be easily changed by following the calibration procedure. A container
of KNOWN volume will be needed for the calibration procedure. For the 900 Series meter, a ve gallon container or larger
should be used.
fillrite.com
| 900 MECHANICAL METER
ammable liquid! Fire can result!
transferred to the fuel tank.
or sealant tape to minimize the possibility of leaks.
or empty.
metering ammable uids, and keep the ll nozzle in contact with the container
being lled during the lling process.
cracking may result.
INSTALLATION AND OPERATION MANUAL