Page 1
Installation quick-start guide EN iONiX Light 25 Wallbox iONiX Medium 25 Wallbox iONiX Supreme 25 Wallbox Charging point for electric vehicles according to CCS2 standard iONiX 25_DC-Wallbox_D00461_00_Q_XXEN/11.2023...
Light 25 Wallbox iONiX Medium 25 Wallbox iONiX Supreme 25 Wallbox Installation quick-start guide In addition to this quick-start guide for mechanical and electrical installation, additional documents, such as the manual, are available for download on the product page of the device.
Installation quick-start guide Dimensions Device dimensions Dimensions in mm View from the right View from the front Bottom view Requirements DANGER Electric shock Danger to life The electrical supply line, which is supplied from the sub-distribution, must be de-energised during the entire mechanical mounting process and electrical installation.
Light 25 Wallbox iONiX Medium 25 Wallbox iONiX Supreme 25 Wallbox • If the installation site is outside a protected area of a building, additional lightning protection measures must be taken. • The ceiling height of the installation site should be at least 2.30 m.
Installation quick-start guide 1.4.2 Mounting dimensions Mounting dimensions Dimensions in mm View on mounting surface and mounting rail Wall Floor Interface area Infrastructure cable (cable length above ground at least 1000 mm) Clearance of at least 500 mm on the left and right Network connection Outline of DC Wallbox with holding rail, cable cover and cut of upper status and lighting mast Red Drilling holes (top)
Light 25 Wallbox iONiX Medium 25 Wallbox iONiX Supreme 25 Wallbox Dimensions of infrastructure of network connection Dimensions in mm Top view Wall Interface area Infrastructure cable (cable length above ground at least 1000 mm) Outline DC Wallbox 1.4.3...
Page 8
Installation quick-start guide Mounting, top Mounting rail for attachment to the wall View of the mounting rail 1: Retaining lug, top (outside) Mounting, bottom 2: Spacer for attachment points, bottom (outside) 1: Attachment points, bottom (inside) View with the door of the DC Wallbox open iONiX 25_DC-Wallbox_D00461_00_Q_XXEN/11.2023...
Connection Ordinance – NAV). Only trained personnel are authorised to commission the device. To be able to carry out work on the IONIX Wallbox, the installer needs to obtain the certification issued by the Bender Academy or a system partner.
Installation quick-start guide 1.5.1 Tools Tools needed • Stripping tool • Open-end spanners with width across flats 10 mm, 40 mm and 43 mm 1.5.2 Procedure WARNING Before starting work, make sure that the cables for the power supply of the DC Wallbox are dead and secured against being switched on again.
Page 11
Light 25 Wallbox iONiX Medium 25 Wallbox iONiX Supreme 25 Wallbox Connect the cables to the terminal strip according to the terminal labelling Figure 1-3: Terminals Check for secure contact in the terminals by pulling on the individual lines...
Installation quick-start guide Use the operator securing mechanism to seal the door Figure 1-7: Position of operator securing mechanism Restore the power supply The display becomes active after a few minutes ADVICE After you start the DC Wallbox, drying is started by default and can last up to 30 min. While this is happening, charging is not possible.
Page 13
Light 25 Wallbox iONiX Medium 25 Wallbox iONiX Supreme 25 Wallbox Noise emissions* 54.6 dB(A)** Max. sound pressure level at a distance of 1 m At 25 kW power and 18 °C ambient temperature Charging Charging point 1 x DC Max.
Installation quick-start guide Degree of protection IEC 60529 + A1 + A2 IP54 Radiant heat < 1090 W/m² UV index < 10 EMC according to IEC 61851-21-2 Interference sensitivity class Interference emission class Impact resistance according to IEC 62262 IK 10 Installation height <...