General Information
Maximum operating pressure: 500 kPa. A pressure reducing device is required if water pressure exceeds 500 kPa.
Minimum operating pressure: 150 kPa. Maximum water temperature: 80°C. This temperature rating is for the
tapware product. For safety and to avoid risk of scalding, please refer to your water heater instruction manual.
For The Plumber :
1. All work should be carried out by a licensed plumber. Responsibility will not be accepted for incorrect installation of
this tapware, or any tapware not installed by a registered Plumber.
2. The water supply lines need to be 'flushed out' prior to installation. This will avoid any foreign materials blocking the
flow regulator, damaging the cartridge/valve and reducing the flow of water.
3. Connect the spout assembly or shower head into the wall outlet.
4. Install the stuffing box assembly to the wall connection. Ensure it is connected to the correct water supply.
5. Ensure all connections are tight.
6. Turn on the main water supply and check for leaks.
Arm Adjustment :
1. Arm can be cut to suit required length.
2. Simply remove grub screws and remove arm/ceiling dropper.
3. Cut to shorten length and re attach grub screws.
Failure to sufficiently tighten grub screws can lead to product failure and possible void of warranty.
Kado - Era Ceiling and Wall Shower
Kado Era Ceiling and Wall Shower
Page 01
of 02
Need help?
Do you have a question about the Kado Era and is the answer not in the manual?
Questions and answers