Input/Output Connections; Table 3-1. Connectors And Jumpers; Table 3-2. Test Points - Texas Instruments TPS54KC23EVM User Manual

Step-down converter evaluation module
Table of Contents

Advertisement

www.ti.com

3.1 Input/Output Connections

The TPS54KC23EVM is provided with input connectors, output connectors, and test points as shown in
3-1
and
Table
3-2.
To support the minimum input voltage with the full rated load on both outputs with the default EVM, a power
supply capable of supplying greater than 10 A must be connected to the VIN and PGND terminal blocks (J1 for
U1, and J3 for U2) through a pair of 18-AWG wires or better.
For U1, the load must be connected to J2 and for U2, the load must be connected to J4. A pair of 10-AWG wires
or better must be used for each connection. With the maximum current limit setting, the maximum load current
capability is near 33 A before the TPS54KC23 goes into current limit. Wire lengths must be minimized to reduce
losses in the wires.
REFERENCE
NAME
DESIGNATOR
J1
VIN1
J2
VOUT1
J3
VIN2
J4
VOUT2
J5
EN2
J8
REFERENCE
NAME
DESIGNATOR
TP1
VIN1
TP2
SW1
TP3
VOUT1
TP4
REG_GND1
TP5
VCC1
TP6
PG1
TP7
BODE1
TP8
REG_VOUT1
TP9
PGND1
TP10
AGND1
TP11
VOUT_U1
TP12
VIN2
TP13
VOUT2
TP14
SW2
TP15
EN2
TP16
VCC2
TP17
REG_GND2
TP18
PG2
TP19
BODE2
TP20
REG_VOUT2
SLVUCU8 – JANUARY 2024
Submit Document Feedback

Table 3-1. Connectors and Jumpers

RELATED IC
U1
VIN screw terminal to connect input voltage (see
U1
VOUT screw terminal to connect load to output
U2
VIN screw terminal to connect input voltage (see
U2
VOUT screw terminal to connect load to output
EN pin selection header:
Open = (EN pin shorted to AGND)
U2
Short = (EN pin connected to VIN pin through resistor divider)
MSEL selection header. Use shunt to select MSEL resistor (see
-
U2
MSEL pin selection)

Table 3-2. Test Points

RELATED IC
U1
VIN test point. Use this for efficiency measurements.
U1
SW node test point
U1
VOUT test point
U1
PGND test point. Use this for efficiency measurements.
U1
VCC test point
U1
PGOOD output test point (pulled up to VCC pin through a 10-kΩ resistor)
Test point between voltage divider network and output voltage. Used for Bode
U1
plot measurements.
VOUT test point. Use this for efficiency, output regulation, and bode plot
U1
measurements.
U1
PGND test point. Use this for efficiency measurements.
U1
AGND test point
SMB connector to measure output voltage. When using this test point, set the
U1
scope for 1-MΩ termination. When using 50-Ω termination, a 2:1 divider is
created.
U2
VIN test point
U2
VOUT test point
U2
SW test point
U2
EN test point
U2
VCC test point
U2
PGND test point. Use this for efficiency measurements.
U2
PGOOD output test point (pulled up to VCC pin through a 10-kΩ resistor)
Test point between voltage divider network and output voltage. Used for Bode
U2
plot measurements.
VOUT test point. Use this for efficiency, output regulation, and bode plot
U2
measurements.
Copyright © 2024 Texas Instruments Incorporated
FUNCTION
Table 1-1
Table 1-1
FUNCTION
TPS54KC23EVM Step-Down Converter Evaluation Module
Test Setup and Results
Table
for VIN range)
for VIN range)
Table 2-1
for
7

Advertisement

Table of Contents
loading

Table of Contents