Biddle STYLE2 Series Installation Operation & Maintenance page 8

Hide thumbs Also See for STYLE2 Series:
Table of Contents

Advertisement

ALWAYS
Ensure lifting operations are planned,
supervised and carried out in a safe
manner.
Ensure
all
lifting
accessories are free of damage and
suitable for the proposed use.
Attach lifting equipment securely to the
load ensuring load will remain stable when
lifted.
Ensure the load is balanced and will not tilt
or fall.
Refer to the relevant local or statutory
codes for safe lifting practices.
Multiple Air Curtains
For multiple air curtains joined together over a doorway an additional wall bracket (6811940) or ceiling
bracket (6811950) must be fitted at each joining point, refer below to Figure 2. Inlet casings should only
be fitted after all functional tests have been completed and verified (refer to section 4 - Commissioning).
Version 5.0 (Original Manual)
INVISIDOR STYLE
AIR CURTAIN: Installation, Operation & Maintenance Instructions
2
equipment
and
Figure 2. Horizontal Multiple Installation above doorway
NEVER
Allow inexperienced personnel to operate
lifting equipment.
Use damaged accessories or equipment.
Attempt to shorten, twist, knot or tie slings.
Overload slings.
Hammer,
force
accessories into position.
Allow personnel to ride on loads.
Stand directly below the load whilst lifting.
or
wedge
slings
or
Page | 8