Panel/Window Construction Sleeve Installation; Panel/Window Wall Construction Sleeve Installation With Field-Supplied Louvers - ICE AIR RSNU Installation Manual

Packaged terminal air conditioner (ptac) unit for new construction
Table of Contents

Advertisement

Panel/Window Wall
Construction Sleeve
Installation
Standard wall sleeves are designed to be
easily installed. For panel wall and thin wall
construction, the (optional) top angle should
be used and the wall sleeve supplied with a
turned down flange.
IMPORTANT: Depending on the size and
style of the louver chosen, you should
determine whether it can be installed before
or after the sleeve installation.
1. Clean the opening of all debris that may
interfere with installation.
2. Recess the wall opening so that the
louver is flush with the exterior of the
building. Locate the center of gravity
(approximately 10 3/4" from rear
face of standard wall sleeve). If wall
sleeve has been installed into a thick
wall, make certain that the wall sleeve
protrudes into the room a minimum of
1 1/8" beyond finished wall surface to
accommodate heat section and room
cabinet. If a subbase is not used, field
support (metal, wood or concrete) must
be provided to balance the center of
gravity.
3. Level wall sleeve in all directions and
anchor with appropriate fasteners. Use
holes provided or drill additional holes
as required to secure firmly. DO NOT
drill holes in base of the wall sleeve.
Use shims between wall and wall sleeve
to prevent wall sleeve distortion during
anchoring.
4. Caulk wall sleeve (from inside the
building) to wall opening on both inside
and outside perimeter. DO NOT plug the
weep holes.
Due to Ice Air's ongoing product development programs, the information in this document is subject to change without notice.
INSULATED PANEL (BY OTHERS)
1X1X18GA.
ANGLE ALL
AROUND
SLEEVE
LOUVER
(BY OTHERS) (1)
16-5/8"
INSULATION
PANEL OPENING
(STD.)
U-CLOSURE ALL
AROUND (BY OTHERS)
SLEEVE
ATTACHMENT
SCREWS
(BY OTHERS)
CAULKING ALL AROUND (BY OTHERS)
Notes
1. Provided louver will have an area of 60% minimum free air
2. 3 1/8" above top of sleeve on roomside must be kept clear for mounting of heating coil and enclosure.
3. Wall sleeve dimension is 16 1/4" H x 42" W (RSNU shown)
4. When bottom of sleeve to finished floor ("a") measures between 2 3/4" to 4 1/2", this necessitates ordering a
front intake enclosure and chassis as opposed to a bottom intake.
* Architect to provide details for each floor.
Panel/Window Wall Construction
Sleeve Installation with Field-
Supplied Louvers
Installation of wall sleeves with continuous
louvers is very similar to that of applications
with factory furnished louvers.
IMPORTANT: Louvers supplied by other
manufacturers must have 70% free area or a
pressure drop not exceeding 0.05 in. w.g.
(12.45 Pa) at 300 fpm (1.524 m/sec)
face velocity, and a blade design that will
not cause recirculation of air. Ice Air does
not warrant the rain and water leakage
resistance of its equipment when used with
louvers supplied by others. All louvers by
other manufacturers must be approved by
qualified installer prior to installation.
8
WALL DEPTH
SLEEVE DEPTH*
11 1/4"
SLEEVE
MINIMUM
HEIGHT*
(16 1/4"
5/8"
STD)
4"
RAIN LIP
MUST GO
BEYOND
INSULATED
PANEL
ADJUSTABLE LEG SUPPORT* (FASTENED TO SLAB BY OTHERS)
10"
HEATING COIL
3 1/8"
REQ'D.
(2)
ENCL.
HEIGHT*
(22"
STD.)
OUTLINE OF
A/C UNIT
1/4" PITCH
(4)
"A"
FINISHED FLOOR

Advertisement

Table of Contents
loading

Table of Contents