Before You Begin

1. Locate the unit where it can evenly
distribute air throughout the room
without obstructions. Units should be
installed no closer than 12" apart when
two units are side by side. A vertical
clearance of 60" should be maintained
between units.
2. Ensure the wall is structurally sound to
support the weight of the unit.
3. Ensure adequate drainage is available.
4. Follow all applicable codes for
installation.
Note:
Components, parts and
dimensions shown may vary
depending on options and type
of installation.
LEVELS
Due to Ice Air's ongoing product development programs, the information in this document is subject to change without notice.
5. Verify the amperage of the dedicated
electrical service to the unit is correct
and the unit can reach the power supply.
6. Position the unit so the air filter can
be removed easily and required
maintenance can be performed without
interference.
7. A minimum obstructed distance of 36"
should be kept around the unit.
IMPORTANT: To avoid permanent damage
to the unit, DO NOT operate during
construction in an open space or as a
supplemental heating and cooling source
during construction.
5
FINISHED WALL
SLEEVE
INSTALL
ABOVE FINISHED FLOOR
AS DETERMINED BY JOB
CONDITIONS REFER TO
CERTIFIED DRAWINGS