Overview/Application Note/Inspection - ICE AIR RSNU Installation Manual

Packaged terminal air conditioner (ptac) unit for new construction
Table of Contents

Advertisement

Overview
Installing the Ice Air PTAC unit involves four main components and various accessory components.
Application Note
It is important for air conditioning systems to be properly sized for each application in order to achieve desired temperature and humidity
levels. It is highly recommended that a professional engineer match the PTAC units you are about to install with the building structure and
climate.
ENCLOSURE
10" MIN
ADJUSTABLE
LEGS
ENCLOSURE
FRONT COVER
Inspection
1. Upon receipt of the equipment, carefully check the shipment again on the Bill of Lading.
2. Make sure all units have been received.
3. Inspect the packaging for any damage.
4. Ensure that any damage is noted on the delivering carrier's Bill of Lading.
NOTE: It is the responsibility of the purchaser to file all necessary claims with the delivering carrier in a timely fashion. Many carriers have a 15
day notice period from receipt of delivery to file any and all claims.
Due to Ice Air's ongoing product development programs, the information in this document is subject to change without notice.
HYDRONIC
HEATING ASSEMBLY
(OPTIONAL)
11"
COOLING
CHASSIS
54"
42"
22"
2" MIN
7.5" MIN
ADJUSTABLE
KICK PLATE
(OPTIONAL)
TO BE ATTACHED TO SLEEVE
USING 4 THREADED STUDS.
WASHERS AND NUTS
WALL SLEEVE
40"
15.00"
CHASSIS CLIP
9.25"
3
LOUVER
SHEETROCK
SLOT TO ATTACH
CHASSIS CLIP
Notes:
Optional Electric Heating Assembly
pre-installed into Chassis.
Components, parts and dimensions
shown may vary depending on options
and type of installation.