Installing The Chassis - ICE AIR RSNU Installation Manual

Packaged terminal air conditioner (ptac) unit for new construction
Table of Contents

Advertisement

Installing the Chassis

SLEEVE DEPTH
(12-1/2" MINIMUM
ENCLOSURE DEPTH
ELECTRIC OUTLET BY ELECTRICAL
CONTRACTOR 115V, 15A OR 208V,
15A AS REQUIRED.
RECOMMENDED LOCATION OF
ELECTRICAL OULET
INSTALL THE ELECTRICAL OUTLET
WHERE THE END-USER CAN EASILY
CONNECT/DISCONNECT
THE POWER CORD PLUG.
NEMA
5-15
Due to Ice Air's ongoing product development programs, the information in this document is subject to change without notice.
1. Remove the cabinet front from the
chassis by pulling it out from the bottom
to release it, then lift it up to clear the
rail along the chassis top.
NEMA
6-15
+0
4"
-1"
BOTTOM OF SLEEVE
"A"
WALL SLEEVE
COOLING
CHASSIS
SLEEVE WIDTH
LOUVER
RAIN LIP
L C
54"
TOP VEW
23-3/4"
DISCHARGE PLENUM OR
HYDRONIC HEATING ASSEMBLY (Optional)
C L
"B": 2" MIN
KICK PLATE
FRONT VEW
CHASSIS CLIP
11
2. Insert the chassis into the wall sleeve
by sliding into the wall sleeve until the
chassis flanges contact the front edge of
the wall sleeve.
3. Secure the chassis to the wall sleeve
using two screws on each side of the
chassis to ensure a proper seal between
the chassis and the wall sleeve.
Notes:
Components, parts and dimensions
shown may vary depending on options
and type of installation.
"A" is bottom of sleeve to finished floor.
"B" is kick plate height with +/- 1" adj.
"B" = "a" -2 1/2"
22"
When "A", bottom of sleeve to finished
floor, measures between 2-3/4" to
4-1/2", it is advised to order a front
intake enclosure and chassis as opposed
F.F.
to a regular bottom intake.
T.O.S.
SHEETROCK
SLOT TO ATTACH CHASSIS CLIP

Advertisement

Table of Contents
loading

Table of Contents