Samson 43-3 Mounting And Operating Instructions page 48

Table of Contents

Advertisement

Decommissioning
To decommission the regulator for service
work or disassembly, proceed as follows:
1. Close the shut-off valves in the flow pipe
and return flow pipe.
2. Close any shut-off valve installed on the
downstream and upstream side of the
sensor if a thermowell is not used.
3. Completely drain the pipelines and regu-
lator.
4. Depressurize the plant.
5. If necessary, allow the pipeline and reg-
ulator components to cool down or warm
up to the ambient temperature.
10-2
EB 2173 EN

Advertisement

Table of Contents
loading

Table of Contents