Setting Up Your Dell Edge Gateway; Professional Installation Instructions - Dell N01G Installation And Operation Manual

Table of Contents

Advertisement

Setting up your Dell Edge Gateway

WARNING: Before you begin any of the procedures in this section, read the safety information that shipped with your
system. For additional best practices information, go to www.dell.com/regulatory_compliance.
WARNING: When installing the Gateway, the responsible party or integrator shall use the AC Adapter provided with the
Dell Edge Gateway, or connect to a 24Vac or 24Vdc power source already present as part of the clients installation.
WARNING: The Dell AC Adapter (full-wave rectified and have no built-in isolation transformer) is acceptable for use up to
ambient temperature of 40°C and is a limited power source, SELV/Limited Energy Circuit, Class 2 power source. If
ambient temperature of the installation exceeds 40 °C then use the 24Vac or 24Vdc power available as part of the
installation.
WARNING: Always make sure that the available power source matches the required input power of the Dell Edge
Gateway, check the input power markings next to power connector(s) before making connections. The 24 V power
source must be compliant with local Electrical Codes and Regulations.
WARNING: To ensure the protection provided by Dell Edge Gateway is not impaired, do not use or install the system in
any manner other than that which is specified in this manual.
WARNING: When installing the Gateway use acable appropriate for the load currents: 3-core cable rated 5 A at 90 °C
(194 °F) minimum, which conform to either IEC 60227 or IEC 60245. The system accepts cables from 0.8 to 2.5 mm (18
to 14 AWG).
WARNING: The symbol
use that can cause a burn. Allow equipment to cool off or use protective gloves when handling to reduce risk of a burn.
WARNING: If a battery is included as part of System/Network, battery must be must be installed with appropriate
enclosure in accordance with local Fire and Electrical Codes and Laws.
WARNING: When installing the Power Module, use a cable appropriate for the load currents: 3-core cable rated 15 A at
90 °C (194 °F) minimum, which conform to either IEC60227 or IEC 60245. The Gateway accepts cables of 14 AWG
minimum.
WARNING: Before installing that all of three power inputs (Terminal Block/Power Jack/Battery Input) in power module
shall be protected by the 20 A fuses or circuit-breakers(over current protection device) in front of this system.
WARNING: The system is for installation in a suitable industrial enclosure (provides electrical, mechanical and fire hazard
protection).
WARNING: The core module only can be wall mounted (without the need for an additional enclosure)
WARNING: Only Sealed Lead Acid (SLA) battery rated 50Ah (or less) shall be used

Professional installation instructions

Installation personnel
This product is designed for specific applications and needs to be installed by qualified personnel with RF and regulatory related
knowledge. The general user shall not attempt to install or change the setting.
Installation location
The product shall be installed at a location where the radiating antenna is kept 20 cm from nearby persons in its normal operation
condition in order to meet regulatory RF exposure requirements.
16
indicates hot surface or adjacent hot surface that can obtain temperature during normal
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Edge 5100Edge 5000 seriesN02g

Table of Contents