ActronAir EVA720T Installation And Commissioning Manual

ActronAir EVA720T Installation And Commissioning Manual

Variable capacity commercial 72 - 96kw indoor r-410a series
Hide thumbs Also See for EVA720T:

Advertisement

Quick Links

VARIABLE CAPACITY COMMERCIAL
72 - 96kW Indoor (R-410A Series)
Installation and Commissioning Guide
Model Numbers
EVA720T
EVA850T
EVA960T
IMPORTANT NOTE:
Please read this manual carefully before installing or operating your air conditioning unit.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EVA720T and is the answer not in the manual?

Questions and answers

Summary of Contents for ActronAir EVA720T

  • Page 1 VARIABLE CAPACITY COMMERCIAL 72 - 96kW Indoor (R-410A Series) Installation and Commissioning Guide Model Numbers EVA720T EVA850T EVA960T IMPORTANT NOTE: Please read this manual carefully before installing or operating your air conditioning unit.
  • Page 2: Table Of Contents

    Safety Instructions ��������������������������������������������������������������������������������������������������������������������������5 Components Overview ��������������������������������������������������������������������������������������������������������������������6 Indoor Unit Components Overview Indoor Unit Electrical Panel Overview Unit Dimensions and Clearance ��������������������������������������������������������������������������������������������������������7 EVA720T EVA850T/ EVV960T Installation Instructions ����������������������������������������������������������������������������������������������������������������� 10 Unit Lifting Instructions ����������������������������������������������������������������������������������������������������������������� 12 Condensate and Safety Tray Drainage Instructions ������������������������������������������������������������������������� 13 Electrical Installation ���������������������������������������������������������������������������������������������������������������������...
  • Page 3: Introduction

    Check your air conditioning unit and all items against the invoice upon receiving your shipment. Inspect the unit, components and accessories for any sign of damage. If there is any damage to the unit, contact ActronAir Customer Care Department immediately on: 1300 522 722 to obtain a Goods Return Number.
  • Page 4: Safety Instructions

    Variable Capacity Installation and Commissioning Guide Safety Instructions • Only licensed HVAC technicians* should install and service air conditioning equipment. Improper service or alteration by an unqualified technician could result in significant and major damage to the product or property which may render your warranty null and void.
  • Page 5: Components Overview

    Installation and Commissioning Guide Components Overview Indoor Unit Components Overview NOTES: Drawing is subject to change without notice. Drawing for illustration purposes only (may vary depending on capacity) EVA720T has a single fan configuration TOP PANEL HEAT EXCHANGER INTERNAL ACCESS PANEL...
  • Page 6: Unit Dimensions And Clearance

    Variable Capacity Installation and Commissioning Guide Unit Dimensions and Clearance EVA720T 8012-665-01 Unit Dim 72kW ID Catalogue 20230120 2440 O/A STG1 LIQ Ø15.9(5/8") SWAGED STG1 GAS Ø28.6(1-1/8") SWAGED STG1 LIQ Ø15.9(5/8") SWAGED 1123 STG1 GAS Ø28.6(1-1/8") SWAGED 1982 DETAIL P...
  • Page 7: Eva850T/ Evv960T

    Variable Capacity Installation and Commissioning Guide EVA850T/ EVA960T 2425 O/A STG1 LIQ Ø15.9 (5/8") 1150 STG1 GAS Ø28.6 (1-1/8") SWAGED STG2 GAS Ø28.6 (1-1/8") SWAGED STG2 LIQ 1190 O/A Ø15.9 (5/8") 1141 DETAIL P 1982 1366 1520 O/A 950 (MTG C-C DIST) 950 (MTG C-C DIST) 1125 (MTG C-C DIST) NOTES:...
  • Page 8 1000 mm between the units or between the unit and the outside perimeter is available. 3. Minimum service access areas and spaces for airflow clearances are responsibilities of the installer, ActronAir will not be held liable for any extra charges incurred due to lack of access and space for airflow.
  • Page 9: Installation Instructions

    Compliance and consultation with the authorities having jurisdiction with the installation of this equipment is the responsibility of the installer. ActronAir will not be held liable for any damages or costs as a result of the installer’s failure to comply. Please refer to the matching outdoor unit Installation and Commissioning Guide for further information and details.
  • Page 10 NOTE This indoor unit is designed to match only with an ActronAir Series outdoor unit as specified in the Technical Selection Catalogue. The unit is supplied with factory charged dry air. Be aware of the pressurised air charge when purging. Remove the caps from the connection points and purge the system only when the field pipe connections are ready to be completed.
  • Page 11: Unit Lifting Instructions

    Variable Capacity Installation and Commissioning Guide WH&S regulations must be observed and will take Unit Lifting Instructions precedent during lifting process. Connect the loop ends NOTE RUBBER PADS: of slings into shackle All drawings are for illustration purposes only. Actual Provide rubber pads to prevent unit may vary depending on the model.
  • Page 12: Condensate And Safety Tray Drainage Instructions

    Variable Capacity Installation and Commissioning Guide Condensate and Safety Tray Drainage Instructions Suggested Minimum Slope to Ensure Correct Drainage TOP VIEW SIDE VIEW RETURN AIR Condensate Drain Connection INDOOR COIL INTERNAL CONDENSATE DRAIN TRAY Provide a minimum slope of 10mm per meter Seal with SUPPLY AIR Silicone sealant...
  • Page 13: Electrical Installation

    Variable Capacity Installation and Commissioning Guide Electrical Installation All electrical work must be carried out by a qualified technician. Make sure all wiring is in accordance with local wiring rules. Wiring connections should be made in accordance with the wiring diagram provided. DANGER Live Electrical Supply ! •...
  • Page 14: Wiring Diagram

    Variable Capacity Installation and Commissioning Guide Wiring Diagram Base Variation Code: Variation: EVA720T STANDARD Model No.: Description: WIRING DIAGRAM VCC 72kW EVAP Drawing No: Sheet: Revision: Drawn: 22/08/2022 This drawing remains the intellectual property of Actron Engineering Pty Ltd. This drawing remains the in 0515-9060 Reproduction, modification and/or distribution are prohibited without written consent.
  • Page 15: Wiring Diagram

    Variable Capacity Installation and Commissioning Guide Wiring Diagram TO OUTDOOR UNIT Installation and Commissioning Guide - Variable Capacity Commercial Split Ducted Indoor Units 72-96kW (R-410A Series) Doc. No. 0525-120 Ver. 2 230812...
  • Page 16: Electrical Connection

    Variable Capacity Installation and Commissioning Guide Electrical Connection NOTES • To minimise noise interference, Data and Power cable clearance should be maintained as much as possible. • All drawings are for illustration purposes only. Actual unit may vary depending on the model. •...
  • Page 17: Data Cable Shielding Instructions

    Variable Capacity Installation and Commissioning Guide Data Cable Shielding Instructions 2 Core Twisted (ActronAir Part Number: AEDC2) NOTES • Maintain the twist of the core wires up to the Green Terminal Plug. • Maximum strip length of outer insulation to the Green Terminal Plug is 50mm.
  • Page 18: Circuit Breaker Size Recommendation

    Variable Capacity Installation and Commissioning Guide Circuit Breaker Size Recommendation Circuit Breaker Size Model Amps CRV720T / EVA720T CRV850T / EVA850T CRV960T / EVA960T PKV720T PKV850T PKV960T Notes: Refer to latest edition of AS/ANZ 3000 or AS/ANZ 3008 Australian/New Zealand Wiring Rules to determine required cable size.
  • Page 19: Wiring Connections

    Variable Capacity Installation and Commissioning Guide Wiring Connections NOTE LR7-1 may be used depending on the unit purchased LR7-1 and LC7-2 Wall Control Wiring Connections INDOOR WALL CONTROL WIRING CONTROL BOARD POWER: - BROWN / ORANGE 485 A: - BLUE WALL CONTROLLER +12V A 485 B:...
  • Page 20: Maintenance

    Variable Capacity Installation and Commissioning Guide Maintenance Maintenance Procedures This section describes the procedures that must be performed as a part of normal maintenance program. Regular servicing of equipment by licensed technician is highly recommended. Regular servicing of your unit helps in maintaining its optimum performance and reliability.
  • Page 21 Variable Capacity Installation and Commissioning Guide WARNING Do Not Use High Alkaline Detergent! When using detergent for coil cleaning, ensure that the alkaline level is no higher than 8.5, which can cause corrosion damage to the coils. DANGER No Water into the Electrical Compartments! Ensure consideration is given to the possibility of water entering the electrical compartments during cleaning of the condenser coil.
  • Page 22: Maintenance Frequency Checklist

    Variable Capacity Installation and Commissioning Guide Maintenance Frequency Checklist Regular servicing of equipment by a qualified technician is recommended every 12 months for residential applications and every quarter for commercial applications. Regular servicing of your unit helps in maintaining its optimum performance and reliability.
  • Page 23: Start Up And Commissioning Report

    Variable Capacity Installation and Commissioning Guide Start Up and Commissioning Report INSTALLATION INFORMATION Name: Tel. Number: CUSTOMER Address: Name: Tel. Number: INSTALLER Address: Site Address: Date Installed: Model: Serial Number: CIRCUIT TEMPERATURE SETTINGS Supply Air Temperature Return Air Temperature Suction Temperature Discharge Temperature Condenser Coil Temperature Ambient Temperature...
  • Page 24: Version History

    Variable Capacity Installation and Commissioning Guide Version History DOCUMENT VERSION BOM VERSION UPDATE HISTORY Ver 1 -0100 Released Ver 2 -0100 Included lower capcity models Installation and Commissioning Guide - Variable Capacity Commercial Split Ducted Indoor Units 72-96kW (R-410A Series) Doc.
  • Page 25 ©Copyright 2022 Actron Engineering Pty Limited ABN 34 002767240. ®Registered Trade Marks of Actron Engineering Pty Limited. ActronAir is constantly seeking ways to improve the design of its products. Therefore, specifications are subject to change without notice. Document: 0525-121 Ver. 2 Issue Date: 08/2023...

This manual is also suitable for:

Eva850tEva960t

Table of Contents