Meinberg IMS BPE-3050 Setup Manual

Meinberg IMS BPE-3050 Setup Manual

Hot-plug module

Advertisement

Quick Links

MANUAL
IMS BPE-3050 Setup Guide
Hot-Plug Module
October 19, 2023
Meinberg Funkuhren GmbH & Co. KG

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IMS BPE-3050 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Meinberg IMS BPE-3050

  • Page 1 MANUAL IMS BPE-3050 Setup Guide Hot-Plug Module October 19, 2023 Meinberg Funkuhren GmbH & Co. KG...
  • Page 3: Table Of Contents

    Table of Contents 1 Imprint 2 Copyright and Liability Exclusion 3 Presentation Conventions in this Manual Conventions for the Presentation of Critical Safety Warnings ....Secondary Symbols Used in Safety Warnings .
  • Page 4: Imprint

    1 Imprint 1 Imprint Meinberg Funkuhren GmbH & Co. KG Lange Wand 9, 31812 Bad Pyrmont, Germany Phone: + 49 (0) 52 81 / 93 09 - 0 Fax: + 49 (0) 52 81 / 93 09 - 230 Website: https://www.meinbergglobal.com Email: info@meinberg.de...
  • Page 5: Copyright And Liability Exclusion

    Meinberg reserves the right to make changes of any type to this document at any time as is necessary for the purpose of improving its products and services and ensuring compliance with applicable standards, laws &...
  • Page 6: Presentation Conventions In This Manual

    This signal word indicates a hazard with a high risk level. Such a notice refers to a procedure or other action that will very likely result in serious injury or even death if not observed or if improperly performed. IMS BPE-3050 Setup Guide Date: October 19, 2023...
  • Page 7: Secondary Symbols Used In Safety Warnings

    Warnings of risks of product damage, data loss, and also information security risks are indicated with this type of warning box. Information: Additional information that may be relevant for improving efficiency or avoiding confusion or misunder- standings is provided in this form. Date: October 19, 2023 IMS BPE-3050 Setup Guide...
  • Page 8: Generally Applicable Symbols

    Direct Current (DC) (symbol definition IEC 60417-5031) Alternating Current (AC) (symbol definition IEC 60417-5032) Ground Connection (symbol definition IEC 60417-5017) Protective Earth Connection (symbol definition IEC 60417-5019) Disconnect All Power Connectors (symbol definition IEC 60417-6172) IMS BPE-3050 Setup Guide Date: October 19, 2023...
  • Page 9: Important Safety Information

    • Take note of the chapter "Power Supply". 4.1 Product Documentation Detailed product documentation is provided on a USB flash drive delivered with the Meinberg system. The manuals can also be downloaded from the Meinberg website at https://www.meinbergglobal.com, where you can enter your system name into the search box at the top of the page to find the relevant manual.
  • Page 10: Prevention Of Esd Damage

    ESD-proof bags that are crumpled or have holes cannot provide effective protection against electrostatic discharges. ESD-proof bags must have a sufficient electrical resistance and must not be made of conductive metals if the device has a lithium battery fitted on it. IMS BPE-3050 Setup Guide Date: October 19, 2023...
  • Page 11: Power Supply

    In the event that a power supply unit is no longer working (e.g. defective), please return it to Meinberg for repair. Failure to observe these safety instructions may result in serious injury and/or property damage.
  • Page 12: Replacement Or Installation Of A Hot-Pluggable Ims Module

    Make sure that the module is securely locked into the connector block before you fasten the two screws. Now you can put the installed module into operation. Attachment points of an 1U IMS system IMS BPE-3050 Setup Guide Date: October 19, 2023...
  • Page 13: Important Information Regarding Hot-Pluggable Ims Modules

    Information: The NTP service and access to the web interface will be unavailable while the CPU is not installed. Management and monitoring functions will also be disabled. Date: October 19, 2023 IMS BPE-3050 Setup Guide...
  • Page 14: Bpe-3050 - Backplane Port Expander

    LED A: green, if the desired signal is present on output COM A LED B: green, if the desired signal is present on output COM B Figure right: BPE-3050 PPO_1 (Clock) via D-SUB9 female connectors IMS BPE-3050 Setup Guide Date: October 19, 2023...
  • Page 15: Configuring An Bpe Expansion Card Via The Web Interface

    The BPE-3050 has two outputs via D-SUB9 connectors. Both outputs are connected to the programmable output 1 (Prog. Out 1) of the reference clock. This means that the same output signal is always present at both connectors. Date: October 19, 2023 IMS BPE-3050 Setup Guide...
  • Page 16: Rohs And Weee

    WEEE-compliant fashion, it may be returned to the manufacturer. Any transportation ex- penses for returning this product (at end-of-life) must be covered by the end user, while Meinberg will bear the costs for the waste disposal itself. IMS BPE-3050 Setup Guide...

Table of Contents