Sanyo FISHER V95I Manual page 24

Table of Contents

Advertisement

3-14. GUIDES
3-14-1. GUIDE ROLLER ASSEMBLY (See Fig.3-14-1)
1)
Unscrew
the two screws @). When
you do this, be
careful not to damage the cylinder or the video head.
2) Remove
the two guide
roller assemblies @ by
unscrewing them anticlockwise.
ASSEMBLY NOTES:
1.
Tighten the two screws © to a torque of 600 g/cm.
After tightening, apply a screw-locking glue.
2.
After replacing the parts, be sure to clean the guide
roller and carry out tape path adjustment as described
in section 4-3.
@ Guide
SD
roller
assembly ~
assembly
Fig.3-14-1
3-14-2.S AND T INCLINE MOUNTING ASSEMBLIES
(See Fig.3-14-2)
1)
Refer to section 3-2 and remove the mechanism unit.
2)
Refer to section 3-5-2 and remove the cylinder unit.
3)
Refer to section 3-1 and rotate the loading motor in
the PLAY direction until tape loading is completed.
4) Shift the S incline mounting assembly slightly, in
the direction of the arrow @, then remove it from the
S load lever assembly ©).
5) Shiftthe Tincline mounting assembly@ slightly, in the
direction of the arrow ®), then remove it from the T
load lever assembly @).
ASSEMBLY NOTES:
1.
Apply grease (VHJ-0100) to the rail (top, underside
and sides) on the mechanism chassis.
2.
When
fitting the S and T incline mounting
assem-
blies@ and@) into the rail, turn the loading motor
manually in the EJECT direction. When tape unload-
ing begins, watch out in case the S and T incline
mounting assemblies @ and @) get caught in the rail.
3.
After replacing the parts, clean the cylinder and the
roller guide, then adjust the tape path as described in
section 4-3.
®
S incline mounting
\
assembly
lor incline
@S load lever
|
mounting
assembly
assembly
Apply grease to the oQ
top, underside and —~
@T load lever
sides of the rail.
assembly
4
Fig.3-14-2

Advertisement

Table of Contents
loading

Table of Contents