3
WORK
3.18
Installing the engine guard (All EXC‑F Six Days, EXC‑F AU)
Main work
(EXC‑F EU/AU, EXC‑F Six Days EU)
–
Check throttle cable routing.
Both throttle cables must be routed, side by side, on the back of the handle-
bars and above the fuel tank bracket, to the throttle valve body. Both throttle
cables must be secured behind the fuel tank contact area rubber band.
»
If the throttle cable routing is not as specified:
–
H01695-10
(All US models)
–
Check throttle cable routing.
Both throttle cables must be routed, side by side, on the back of the handle-
bars and above the fuel tank bracket, to the throttle valve body. Both throttle
cables must be secured behind the fuel tank contact area rubber band.
»
If the throttle cable routing is not as specified:
–
V00457-10
Finishing work
–
Install the fuel tank. (
–
Mount the seat. (
–
Attach the engine guard on the frame at the rear and swing up at the front.
–
Mount and tighten screws
Guideline
Remaining screws, chassis
H01638-10
Correct throttle cable routing.
Correct throttle cable routing.
p. 24)
p. 20)
.
M6
10 Nm (7.4 lbf ft)
26