JOB CARD PIST044–001 – Innova 2000 System Interconnect
5-2
Run the cable Set Group 1
1. Unroll the cable set from the spool and lie it down between gantry and technical area (power
cables are not linked to the cable set).
2. Unpack carefully and lie down the free cables of group 1 (optical fiber, water pipes).
3. Add a "pulling wire" to the cable or cable set to be placed in the duct.
4. Pull an other "pulling wire" through the duct between technical area and gantry.
5. Link the cable or cable set to the "pulling wire".
6. Pull the "pulling wire" out of the appropriate duct sliding the cable set through the duct.
7. Adjust cable position at gantry and table level.
8. Unlink cable set and "pulling wire".
Note:
Depending on local regulations, it can be required to put water pipes and power cables in
dedicated ducts.
Note:
The power cable detector between Omega V and LC (mischart 27722A) is not part of spool
but part of group 1.
5-3
Run the cable Set Group 2
Group 2 links the Control booth area to the Technical area.
Extract the cable set from the spool, put the cables on the floor.
D Suppress, if needed the plastic bag and the connector protections.
D Pull the "pulling wire"
D The attachment between "pulling wire" and cable set is a virtual limit to put at the Atlas Cabinet
entrance. If done, all cables shall be long enough to reach the ACAB or the POSTIT bulkheads.
D In Control booth area, the power strip
of them will have a power cord of 2.5 meters to reach the power strip.
D Power strip and KVM support have to be attached on the wall – see § NO TAG.
D Set of cables includes 13 cables for ACAB and 1 cable for POSTIT cabinets.
The power strip delivers two powers:
D UPS type: Flat panel, KVM, one free.
D Non UPS type: External CD, Live monitor, roadmap monitor, two free.
THE FREE PLUGS DRIVE A MAXIMUM POWER OF 150 VA / PLUG
WARNING
10
in the gullet from the control booth area to the technical area.
11
Innova 2000 Cardiovascular Imaging System
13
shall be placed in the isocenter of the peripherals. All
148
Pre–Installation Manual
pim 2337741–100
6 of 10