GE Innova 2000 Preinstallation Manual page 172

Cardiovascular imaging system
Table of Contents

Advertisement

GE Medical Systems
REV 5
Exam room well prepared:
Ceiling: Rails in place & plastic covers available
Ceiling light agreed by radiologist
Wall , Floor: Raceways, conduits in place
Floor: Anchor holes done for gantry (Qty 16) & table (Qty 4)
Wall, Floor: Raceways , conduits in place for Accessories &
options (Injector, Extra monitors, ECG,
Windows: reduced light with black curtains
Gases: available on wall, optionally on anesthesia support
User power plugs with ground connected to our reference
Anesthesia support ground or Injector ground connected to our
reference
Be sure that examination room complies with the 27 C max
Technical area ready:
Wall / floor:
Raceways, conduits in place for cable routing the way
through to ceiling, gantry and control booth
False floor installed for easy access to cables
Cable access ready for the 4 cabinets and the 2 conditioners
Humidity / temperature – is AC completed
Be sure that the temperature in the technical area will not
exceed 32 C (for 7.5kW)
Electrical:
PDB cabinet or equivalent in place
Cabling done for ON/Off room button, Injector power, emer-
gency stop, X–ray on room light
Direct phone line available
Shelves for documentation and local service tools
Control Booth ready:
Wall floor:
Raceways, conduits in place for cable routing (from technical
area & under table top)
False wall available behind table top to mask power boxes
and cables
Table top:
Large enough to support peripherals >1 M
Holes in table top to mask the cables under the table
Others:
Paints & flooring finalized
Pre–Installation could start if:
When System is powered up for the first time, the completed form shall be returned to:
BODELET Philippe GEMS
Difficulty of installation = (2 x A) + B – C – (2 x D)
)
> 24 = Okay
18 – 24 = + 1 day to complete
12 – 18 = + 2 days to complete
6 – 12 = + 3 days to complete
< 6 = + 4 days to complete.
Innova 2000 Cardiovascular Imaging System
O L P
2
(1,5 *0,6m mini)
Black Circle Qty :
A – G =
Fax: (33) 01 30 70 95 90 through June 2001
172
Pre–Installation Manual
Period
Great
I
++
+
=
*
*
O
O
*
O
O
*
O
*
O
O
*
O
O
*
O
O
*
*
*
O
O
O
*
O
O
O
*
O
O
O
*
O
O
O
*
O
O
O
*
*
*
*
*
*
O
O
O
*
*
O
O
O
*
O
O
A
B
C
Column F = 29
pim 2337741–100
Poor
Yes
No
– –
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
D
E
F
G

Advertisement

Table of Contents
loading

Table of Contents