Jason.L Switch System Installation Manual

Jason.L Switch System Installation Manual

Small round meeting frame

Advertisement

INSTALLATION GUIDE
Switch System
Small Round Meeting Frame

Sizes:

700 D
800 D
Tools Required: Power screwdriver.
Note: Please ignore any pre-drilled holes or nut inserts that maybe present in your top(s). They will not match your
particular table/desk base and woods screws will be required to be screwed directly into the underside of the top.
Note: It is important to fully tighten all bolts and screws before attaching the top(s) so that the frame
is su ciently rigid. Failure to do this may a ect stability once the tops are attached.
www.jasonl.com.au
Need help!
Call us on
1300 527 665
Page 1 of 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Switch System and is the answer not in the manual?

Questions and answers

Summary of Contents for Jason.L Switch System

  • Page 1 INSTALLATION GUIDE Switch System Need help! Call us on Small Round Meeting Frame 1300 527 665 Sizes: 700 D 800 D Tools Required: Power screwdriver. Note: Please ignore any pre-drilled holes or nut inserts that maybe present in your top(s). They will not match your particular table/desk base and woods screws will be required to be screwed directly into the underside of the top.
  • Page 2 INSTALLATION GUIDE Switch System Need help! Call us on Small Round Meeting Frame 1300 527 665 COMPONENTS Table Top (700mm D) Leg x3 Leg Bracket x3 Beam Bracket x6 Switch Beam x3 (180mm) L-Bracket x6 SCREWS Hex Nut x3...

Table of Contents