Responsibilities Of The Purchaser/Customer - GE Innova 2121-IQ Biplane Preinstallation Manual

Cardiovascular imaging system
Table of Contents

Advertisement

GE Healthcare

2 Responsibilities of the Purchaser/Customer

To ensure that the installation of an Innova System meets the purchaser or customer expectations,
it is important to determine who will take responsibility for the various items during the system
installation process. To help you in determining these responsibilities, review the following
checklists with the customer and assign responsibilities as appropriate:
Tool and Test Equipment
Pre–Installation Checklist
Contract Changes:
Be sure to inform the customer that the cost of any alteration or modification not specified in the
sales contract are liable to the customer.
The following GE-supplied equipment must be installed by the Hospital's Contractors, per room
drawings:
PDB (Electrical Power Distribution Box or
LC Gantry & Table baseplate hole drilling (Per supplied template)
LP4 Suspension stationary rails (centered on LC Gantry/table floor template)
LCD Monitor suspension stationary rails
LP4 cable drape rail(s)
LC Gantry baseplate grout
LC Gantry baseplate
Omega/Tilt table common baseplate (if applicable)
26
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
(Chapter 7, Tools and Test
(Chapter 7, Pre-Installation
Direction 5177951-4-1EN, Revision 1
Equipment)
Checklist)
Main Disconnect Panel )
2 Responsibilities of the Purchaser/Customer

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3131-iq biplane

Table of Contents