Hussmann VR3-M-EP Installation & Operation Manual page 17

Meat/fish remote
Table of Contents

Advertisement

Installation (cont'd)
3. Set second case within one foot (1') of the first case.
Keep the supports along the length of the case and far
end of case. Level case to the first using the instructions in
step one.
4. Apply liberal bead of case joint sealant (butyl) to
first case. Sealant area is shown using a dotted line in
illustration. Apply heavy amount to cover entire shaded
area.
ATTENTION
INSTALLER
It is the contractor's responsibility to install
case(s) according to local construction and
health codes.
5. Apply liberal bead of case joint sealant (butyl) to
first case. Sealant area is shown using a striped line in
illustration in page 16. Apply heavy amount to cover entire
shaded area.
6. Slide second case up to first case snugly. Then level
second case to the first case so glass front, bumper and
top are flush.
Do not use bolts to pull cases together.
< 1'
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vr3-f-epVr3hv-mf-ep

Table of Contents