After Completion Of A Day's Operation; Manually Operated Chuck - Okuma VTM-200 Operation & Maintenance Manual

Vertical multitasking machine
Table of Contents

Advertisement

2-7.

After Completion of a Day's Operation

Procedure :
1-
Press the CONTROL OFF button on the operation panel.
2-
Turn the main switch on the control box to OFF.
3-
Clean the machine and keep the surrounding area neat and in order.
2-8.

Manually Operated Chuck

Inspection
Check the model name indicated on the chuck body, possible damages during transportation, and
accessories.
SECTION 3 OPERATION (OF CNC LATHE)
5699-E P-47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Osp-p200Osp-p200l

Table of Contents