Remove manual valve C ring 2 and turn manual valve 3
3.
counterclockwise to remove.
Remove O ring (2 pcs) 4 from manual valve 3, check O ring
4.
for damages and deterioration, and replace with new part if
necessary.
5.
Remove seal washer 5, and replace with new part if
necessary.
Apply PTT fluid to new O ring before attaching it
to power tilt assembly.
Attach O rings (2 pcs) 4 to manual valve.
6.
7.
Attach manual valve 3 to power tilt ass'y.
Attach C ring 2.
8.
4st 9.9/15/20 2009
3
3
5
3 Manual valve
4 O ring
5 Seal washer
3
2
4
2
13