Unigas HTLX92R Installation Manual page 15

Table of Contents

Advertisement

MOUNTING AND CONNECTING THE BURNER
MOUNTING AND CONNECTING THE BURNER
ATTENTION! The equipment must be installed in compliance with the regulations in force, following the manufac-
turer's instructions, by qualified personnel. All handling operations must be carried out with appropriate
resources and qualified personnel
ATTENTION: Use intact and correctly dimensioned hoisting equipment, conforms to the local regulations and
health and safety regulations. Do not stand under lifted loads.
If the product must be stored, avoid humid and corrosive places. Observe the temperatures stated in the burner data table at the begin-
ning of this manual. The packages containing the burners must be locked inside the means of transport in such a way as to guarantee
the absence of dangerous movements and avoid any possible damage.
In case of storage, the burners must be stored inside their packaging, in storerooms protected from the weather. Avoid humid or corro-
sive places and respect the temperatures indicated in the burner data table at the beginning of this manual.
Packing
The burners are despatched in wooden crates. Their dimensions are:
9x series: 1600 mm x 1350 mm x 1180 mm (LW x PH x HD)
5xxA series: 1740 mm x 1420 mm x 1100 mm (LW x PH x HD)
burner with gas train detached;
gasket to be inserted between the burner and the boiler;
flexible oil pipes;
oil filter;
envelope containing this manual
Packing cases of this type are affected by humidity and are not suitable for stacking.
To get rid of the burner's packing, follow the procedures laid down by current laws on disposal of
materials.
Handling the burner
The burner is provided with eyebolts, for handling operations.
ATTENTION! The lhandling operations must be carried out by specialised and trai-
ned personnel. If these operations are not carried out correctly, the residual risk for
the burner to overturn and fall down still persists.
To move the burner, use means suitable to support its weight (see paragraph
"Technical specifications").
PART II: INSTALLATION
Transport and storage
15
PART II: INSTALLATION
H
L
P
Eyebolts

Advertisement

Table of Contents
loading

This manual is also suitable for:

Htlx92.1Htlx512.1Htlx515.1Htlx520.1

Table of Contents