Pre Hand Over Check List - Danfoss Termix VVX-IV 7 Series Operating Manual

Table of Contents

Advertisement

Termix VVX-IV - 7 Series DS Fully insulated

Pre hand over check list

Date:
Description:
Connection connected correctly
All connections tightened
Primary system fl ushed, through fl ushing bypass
2 Strainers checked
Diff erential pressure controller adjusted
Clip on actuator removed
Wiring completed
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed
Correct pressure on secondary system
System properly vented
UFH stat mounted correctly on heating supply line
Safety valve checked and piped to drain
DHW Temperature setting
Heating temperature setting
Flushing bypass closed
Insulation has been remounted
32 | © Danfoss | DHS-SRMT/SI | 2022.02
Unit No.:
Pos.
Page
OK
10
11
9
20
31
22
69
22
15-16
10
22-23
26
18
48
20
60
24
4
24
74
25
7
21
Carried out by:
Remark:
LGB55001