Termix VVX-IV - 7 Series DS Fully insulated
Lifting instructions
LGB55001
Temporarily remove the inspection hatch.
Temporarily remove the service hatch.
Lift the HIU in the following two places:
1. On the left hand side around the DHR pipe.
2. On the right hand side around the pipe below T-piece attached to the
heat exchanger.
Now, hang the HIU onto bolts in the wall.
© Danfoss | 2022.02| 9
Need help?
Do you have a question about the Termix VVX-IV 7 Series and is the answer not in the manual?
Questions and answers