Dismantling The Hoist - Alba MC250 Original User Manual

Material hoist
Table of Contents

Advertisement

MC250
be operated over the entire vertical travel, the hoist shall be operated from a point from wich 
you have full visibility of complete travel. 

2.6. Dismantling the hoist

For the dismantling of elevator perform the reverse process to that described in this manual, 
with particular attention to the tasks that present a risk of falling. 
WARNING: 
For dismantling the hoist instructions for installation and use of the elevator shall be
used, and it shall be performed by authorized and trained personnel. 
 
 
 
 
 
 
 
 (+34) 944 71 16 00  (+34) 944 53 17 54  export@alba.es
MC250 Rev.02-USA
 
page
www.alba.es
35 of 78

Advertisement

Table of Contents
loading

Table of Contents