Emergency Descent; Checking Hoist Operation Before Commissioning - Alba MC250 Original User Manual

Material hoist
Table of Contents

Advertisement

MC250

3.3. Emergency descent

The  MC250  has  a  lever  on  the  motor  that  will  allow  emergency  lowering  in  the  event  of  a 
power failure. 
 
 
 
 
 
 
 
 
 
 
 
 
WARNING: 
The operator should move the lever smoothly so that the emergency lowering occurs
slowly. If the parachute activation speed is exceeded, it will lock, preventing descent.
 
 

3.4. Checking hoist operation before commissioning

Before hoist commissioning, hoist service responsible has to check if hoist is in compliance with 
following points:  
Hoist is installed with all operational safety systems: 
 Portable control buttons work correctly 
 Superior endtrack switch stops hoist before reaching superior endtrack buffers. 
 Inferior endtrack switch stops hoist before reaching base buffers. 
 Mast presence detector works correctly. 
 OUT OF SERVICE red light indicator works correctly. 
No  existen  interferencias  entre  el  elevador  y  elementos  exteriores,  mástil,  anclajes, 
There´s no interference of hoist and external items, mast, ties, supporting structure. 
Inferior access area to the hoist is demarcated and protected properly. 
 (+34) 944 71 16 00  (+34) 944 53 17 54  export@alba.es
MC250 Rev.02-USA
page
www.alba.es
38 of 78

Advertisement

Table of Contents
loading

Table of Contents