ICON PRO-FORM COACHLINK T 9.0 User Manual page 15

Table of Contents

Advertisement

14. Set the console assembly (G) on the Handrails
(72). Make sure that no wires are pinched.
Insert the excess Upright Wire (80) into the con-
sole assembly (G). Next, tighten the two ties (I)
around the Upright Wire, and cut off the ends of
the ties.
Then, attach the console assembly (G) with the
four 5/16" x 3/4" Screws (13) that you removed
in step 11 and four 5/16" Star Washers (7); do
not tighten the Screws yet.
15. Attach the Pulse Crossbar (75) to the console
assembly (G) with four #8 x 3/4" Screws (11);
start all four Screws, and then tighten them.
Do not overtighten the Screws.
Firmly tighten the four 5/16" x 3/4" Screws
(13).
14
G
80
72
I
7
13
15
G
13
11
15
72
7
13
75
13
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pftl97718.1

Table of Contents