Installation; General Instructions - Ferroli 0T3B2HGA Instructions For Use, Installation And Maintenence

Table of Contents

Advertisement

BLUEHELIX PRO RRT 24 C

2. Installation

2.1 General Instructions

B
This unit must only be used for its intended purpose. This unit is designed to heat water to a temperature below
boiling point and must be connected to a heating system and/or a water supply system for domestic use, com-
patible with its performance, characteristics and heating capacity. Any other use is deemed improper.
THE BOILER MUST ONLY BE INSTALLED BY QUALIFIED PERSONNEL, IN COMPLIANCE WITH ALL THE IN-
STRUCTIONS GIVEN IN THIS TECHNICAL MANUAL, THE PROVISIONS OF CURRENT LAW, THE REQUIRE-
MENTS OF THE TECHNICAL STANDARDS (BS) AND ANY LOCAL REGULATIONS AND THE RULES OF PROPER
WORKMANSHIP.
Incorrect installation can cause damage or injury for which the manufacturer cannot be deemed responsible.
The unit must be installed in compliance with these instructions and the following standards applicable in
Great Britain.
Gas Safety Regulations (Installations & Use).
Local Building Regulations.
The Building Regulations (Part L).
The Buildings Standards (Scotland - Consolidated) Regulations).British Standards Codes of Practice (BSI):
The Industry Guidance For Installers On Condensate Drainage Pipe Installation (HHIC)
B.S.
5440
B.S.
5440
B.S.
5449
B.S.
6798
B.S.
6891
B.S.
7671
B.S.
4814
B.S.
5482
B.S.
7593
B.S.
5546
B.S.
7967
Model Water By-Laws (Great Britain)
B.S.
5955-8
For Northern Ireland the relevant laws in force must be observed.
Safe handling of materials
Pay attention when handling the boiler insulation panels as they contain materials that could irritate the skin. No part of
the boiler contains asbestos, mercury or CFC's.
The use Personal Protective Equipment (PPE) is always recommended.
Advice for transport and handling
For lifting and transporting always take suitable safety precautions: keep your back straight, bend knees, do not turn
your body, move feet, avoid bending forward or sideways and keep the load as close as possible to your body.
If possible, use a trolley or other suitable means to carry the boiler.
Grip the boiler firmly and, before lifting it, try and find the point where the load is concentrated in order to establish the
centre of gravity and suitably reposition yourself. Ideally seek assistance in lifting the boiler.
EN
Part 1
Flues
Part 2
Air flow and ventilation
.........
Forced circulation hot water production systems
.........
Installation of gas-fired boilers for hot water
.........
Gas systems
.........
IEE wiring system standards
.........
Specifications for expansion tanks
.........
LPG systems
.........
Water treatment in central heating systems for DHW production
.........
Installation of systems for DHW production
.........
Guide for the use of electronic portable combustion gas analysers
.........
Installation of plastic pipes
cod. 3541T010 - Rev. 00 - 10/2019
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bluehelix pro rrt 24 c

Table of Contents