Installation; Installation Prerequisites; Safety Gear; Tools - SolaX Power BMS Parallel Box-II G2 User Manual

Table of Contents

Advertisement

Installation

4
Installation
4.1

Installation Prerequisites

When assembling the system, avoid touching the terminal with any metal objects
or bare hands. The box provides a safe source of electrical energy when operated
as designed.
The previous safety precautions and the warning messages described in this
section must be observed. If any of the previous precautions are not fully
understood, or if you have any questions, contact customer service for guidance.
The Safety Section may not include all regulations for your region.
Ensure that the installation location meets the following conditions:
The building is designed to withstand earthquakes
The location is far from the sea to avoid salt water and humidity, over 0.62
miles/997.79 meters
The floor is flat and level
No inflammable or explosive materials within a range of at least 3 ft/0.91 m.
The ambiance is shady and cool, away from heat and direct sunlight
The temperature and humidity remain at a constant level
There is minimal dust and dirt in the area
There are no corrosive gases present, including ammonia and acid vapor
In practice, the requirements of the parallel box installation may be different due to
enviroment and locations. In that case, please follow up the exact requirements of
the local laws and standards.

Safety Gear

4.2
Installation and maintenance personnel must operate according to applicable
federal, state, and local regulations as well as industry standards regarding product
installation. Personnel must wear safety gear as indicated below in order to avoid
short circuit and personal injury.
Insulated Gloves
Safety Goggles
10
Safety Shoes

4.3 Tools

The following tools are required to install the box.
Torque Screw Driver
Phillips-Screw Driver
Phillips-Head Screw Driver Flat-Head Screw Driver
Drill
Tape Measure
4.4
Installation
4.4.1

Check for Transport Damage

Ensure the box is intact during and after transportation. If there are visible
damages such as cracks, contact your supplier immediately.
4.4.2

Unpacking

Unpack the box package by removing the packing tape. Ensure the box
modules and relevant items are complete. See the package items on section
4.4.3 and check the packing list carefully. If there is any items missing, please
contact our company or your distributor directly.
CAUTION!
According to regional regulations, it may require several people to
move the equipment.
WARNING!
Please follow the installation steps strictly. Our company will not be
responsible for any injuries or loss incurred by incorrect assembly
and operation.
Installation
Hexagon Wrench
Torque Wrench
Pencil or Marker
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BMS Parallel Box-II G2 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Triple power bms parallel box-ii g2

Table of Contents