SolaX Power T-BAT-SYS-HV-R2.5 User Manual
SolaX Power T-BAT-SYS-HV-R2.5 User Manual

SolaX Power T-BAT-SYS-HV-R2.5 User Manual

Triple power lithium-ion battery 50 ah, 72 ah

Advertisement

Quick Links

SolaX Power Network Technology (Zhejiang) Co., Ltd.
Add.: No. 288, Shizhu Road, Tonglu Economic Development Zone, Tonglu City,
Zhejiang Province, 310000 P.R. CHINA
Tel.: +86 (0) 571-5626 0011
E-mail: info@solaxpower.com
Copyright © SolaX Power Technology (Zhejiang) Co., Ltd. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without
prior written consent of SolaX Power Technology (Zhejiang) Co., Ltd. (hereinafter referred to as
SolaX). SolaX reserves the right of final interpretation.
320101039001
Triple Power Lithium-ion Battery
50 Ah, 72 Ah
User Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the T-BAT-SYS-HV-R2.5 and is the answer not in the manual?

Questions and answers

Summary of Contents for SolaX Power T-BAT-SYS-HV-R2.5

  • Page 1 Zhejiang Province, 310000 P.R. CHINA No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of SolaX Power Technology (Zhejiang) Co., Ltd. (hereinafter referred to as Tel.: +86 (0) 571-5626 0011 SolaX).
  • Page 2: Table Of Contents

    3.1.3 APPEARANCE ..................10 3.2 BASIC FEATURES....................12 3.2.1 FEATURES....................12 3.2.2 CERTIFICATIONS ................12 3.3 SPECIFICATIONS....................13 3.3.1 T-BAT-SYS-HV-R2.5 ................13 3.3.2 T-BAT-SYS-HV-R3.6 ................15 PREPARATION BEFORE INSTALLATION ..............17 4.1 INSTALLATION PREREQUISITES ..............17 4.2 SAFETY GEAR.......................18 4.3 TOOLS ........................18 4.4 PREPARATION.......................18 4.4.1 CHECK FOR TRANSPORT DAMAGE...........18 4.4.2...
  • Page 3: Note On This Manual

    5.2.1 RACK INSTALLATION ................22 installation, commissioning, maintenance and failure of the product. Read it carefully 5.2.2 CABINET INSTALLATION ..............32 before operation. COMMISSIONING .......................44 T-BAT-SYS-HV-R2.5/T-BAT-SYS-HV-R3.6 BMS 6.1 DIP SWITCH ......................44 TBMS-MCR0800 6.2 COMMISSIONING....................45 T-BAT-SYS-HV-R2.5 Module 6.3 STATUS INDICATORS..................48 6.3.1 BMS (TBMS-MCR0800) ..............48 TP-HR25 TROUBLESHOOTING ....................49...
  • Page 4: Safety

    2. Safety 2. Safety Safety 2.1.2 Explanation of Symbols Explanation Safety Instructions Symbol For safety reasons, installers are responsible for familiarizing themselves with the CE mark of conformity contents of the Manual and all warnings before performing installation. 2.1.1 General Safety Precautions TUV certification WARNING! Do not crush or impact the battery, and always dispose of it according...
  • Page 5: Response To Emergency Situations

    2. Safety 2. Safety Response to Emergency Situations 2.2.3 Wet Batteries and Damaged Batteries Do not touch the battery module after being wet from and soaked in the water. 2.2.1 Leaking Batteries Do not use the battery module if it is damaged. Otherwise, the loss to life and In case the leakage of electrolyte solution occurs, please avoid direct contact with property will be caused.
  • Page 6: Product Introduction

    3. Product Introduction 3. Product Introduction Product Introduction 1.26 in 17.65 in/448.40 mm 32.00 mm Product Overview For safety reasons, installers are responsible for familiarizing themselves with the contents of the Manual and all warnings before performing installation. 3.1.1 Dimensions and Weight Rear A battery management system (BMS) is an electronic system that manages a rechargeable battery.
  • Page 7: Installation Space

    3. Product Introduction 3. Product Introduction Installation Space 3.1.2 TBMS-MCR0800 TP-HR25 TP-HR36 Rack Installation Cabinet Installation Length 17.40 in./442.00 mm 17.40 in./442.00 mm 17.40 in./442.00 mm ■ ■ Width 15.39 in./391.00 mm 15.39 in./391.00 mm 15.39 in./391.00 mm Height 5.12 in./130.00 mm 5.12 in./130.00 mm 5.12 in./130.00 mm Weigth...
  • Page 8: Appearance

    3. Product Introduction 3. Product Introduction 3.1.3 Appearance ■ Section view of TP-HR25/TP-HR36 Section view of TBMS-MCR0800 ■ Description VI VII VIII X XIII COM-A: Connect BMS's COM B or battery module's COM B B+: Connect BMS's B- or battery module's B- B-: Connect BMS's B+ or battery module's B+ GND: Battery module's GND COM-B: Connect battery module's COM A...
  • Page 9: Basic Features

    3. Product Introduction 3. Product Introduction Basic Features Specifications 3.2.1 Features 3.3.1 T-BAT-SYS-HV-R2.5 The T-BAT-SYS-HV is one of the most advanced energy storage systems on the Configuration List ■ market today, using state-of-the-art technology, and having the characteristics of Nominal Operating high reliability and convenient control.
  • Page 10: T-Bat-Sys-Hv-R3.6

    3. Product Introduction 3. Product Introduction 3.3.2 T-BAT-SYS-HV-R3.6 Module T-BAT H R20 T-BAT H R22.5 T-BAT H R25 T-BAT H R27.5 T-BAT H R30 T-BAT H R32.5 Configuration List ■ Nominal Voltage (Vdc) 409.6 460.8 563.2 614.4 665.6 Operating Voltage (Vdc) 360-465 405-522 450-580...
  • Page 11: Preparation Before Installation

    3. Product Introduction 4. Preparation before Installation Prepration before Installation Module T-BAT H R28.8 T-BAT H R32.4 T-BAT H R36 T-BAT H R39.6 T-BAT H R43.2 T-BAT H R46.8 Nominal Voltage (Vdc) 409.6 460.8 563.2 614.4 665.6 Operating Voltage (Vdc) 360-465 405-522 450-580...
  • Page 12: Safety Gear

    4. Preparation before Installation 4. Preparation before Installation Safety Gear 4.4.2 Unpacking Unpack the battery package by removing the packing tape. Ensure the battery Installation and maintenance personnel must operate according to applicable modules and relevant items are complete. Refer to the packaging items in section federal, state, and local regulations as well as industry standards regarding product "4.4.3 Accessories"...
  • Page 13: Accessories

    4. Preparation before Installation 4. Preparation before Installation 4.4.3 Accessories Accessories for Quick Rack ■ BMS (TBMS-MCR0800): ■ Accessories included are shown as follows: Item Description Quantity Accessories included are shown as follows: Front Side Item Description Quantity Rear Side Communication Cable Metal lPlate Power Cable (Black)
  • Page 14: Equipment Installation

    5. Equipment Installation 5. Equipment Installation Equipment Installation Back side Installation Environment Requirements Ensure that the equipment is installed in a well ventilated environment; ■ To prevent fire due to high temperature, ensure that the ventilation vents or heat ■ dissipation system are not blocked when the equipment is running;...
  • Page 15 5. Equipment Installation 5. Equipment Installation Step 3. Add the rack and battery module Put the battery module into the rack ① Put the Front and Rear Sides, to make sure that location pins are securely Screw M6×L16 into the front side of the second rack (Torque: 4-5 N·m) ①...
  • Page 16 5. Equipment Installation 5. Equipment Installation Step 5. Repeat the Step 4 to install the remaining battery modules and BMS Wiring ■ After installation is completed, it is shown as follows: After installation, connect a battery module to another battery (or BMS), and BMS to inverter.
  • Page 17 5. Equipment Installation 5. Equipment Installation Connect cables between battery modules, and battery to BMS. See figure below. BMS to Inverter • Note! The connector connecting to inverter from BMS is delivered with the inverter, for details, please refer to the inverter's User Manual. Power cable (black): Connect BAT- of BMS to BAT–...
  • Page 18 5. Equipment Installation 5. Equipment Installation Connect cables between BMS and inverter. See figure below. Making a BMS communication cable ■ If users want to make a BMS communication cable or a BMS communication cable Communication cable: connect BMS of BMS (battery is required to be made before wiring, to ensure normal operation of BMS and management system) to BMS of inverter inverter, please read the following carefully.
  • Page 19: Cabinet Installation

    5. Equipment Installation 5. Equipment Installation 5.2.2 Cabinet Installation As for the installation of inside cabinet and battery modules, please follow the steps as below. As for the installation of outside cabinet, please follow the guide delivered with the There are two alternative sizes (22U and 42U) of cabinets available for users. The cabinet.
  • Page 20 5. Equipment Installation 5. Equipment Installation Step 2. Insert Cassette Nuts into holes on the front Mounting Rail facing the cabinet Step 3. Fix and screw the L-shaped Transverse Support on the Mounting Rails with door, with totaling 28 Cassette Nuts of one front Mounting Rail. Cross External Hexagon Screw (M6*L16 X 4) (Torque: 4-5 N·m).
  • Page 21 5. Equipment Installation 5. Equipment Installation Step 4. After all L-shaped Transverse Support are secured, Step 5. Place battery modules into the cabinet, and screw them (Torque: 4-6 N·m) (1) Attach the assembled Mounting Rails into the cabinet, making sure all four Mounting Rails are at the same level.
  • Page 22 5. Equipment Installation 5. Equipment Installation Step 6. Repeat the Step 5 until BMS has been put into the cabinet. The figure after Wiring ■ finishing installation is as follows. After installation, connect a battery module to another battery (or BMS), and BMS to inverter.
  • Page 23 5. Equipment Installation 5. Equipment Installation Connect cables between battery modules, and battery to BMS. See figure below. • BMS to Inverter Note! The connector connecting to inverter from BMS is delivered with the inverter, for details, please refer to the inverter's User Manual. Power cable (black): Connect BAT- of BMS to BAT–...
  • Page 24 5. Equipment Installation 5. Equipment Installation Connect cables between BMS and inverter. See figure below. Making a BMS communication cable ■ If users want to make a BMS communication cable or a BMS communication cable is required to be made before wiring, to ensure normal operation of BMS and inverter, please read the following carefully.
  • Page 25: Commissioning

    6. Commissioning 6. Commissioning Commissioning Commissioning Before commissioning, please check to ensure that, the installed battery modules DIP Switch are the same model battery module, and all the ground wires, power cables and communication cables are connected. The following figure is DIP switch, and it is equipped on BMS. Power ON ■...
  • Page 26 6. Commissioning 6. Commissioning Note! Power Off ■ 1. Turn the Breaker off; Frequently pressing the POWER button may cause a system error. ■ 2. Press and hold the POWER button for more than 1 sec. At this point, the status Wait at least 10 seconds after pressing the POWER button prior to making ■...
  • Page 27: Status Indicators

    6. Commissioning 7. Troubleshooting Status Indicators Troubleshooting 6.3.1 BMS (TBMS-MCR0800) Troubleshooting The power indicators show the current battery percentage, with details as show in Check the previous indicators to determine the status of the T-BAT system. the figure below. In case of the following circumstances, e.g. voltage or temperature exceeds a limit, a warning state will be triggered.
  • Page 28 7. Troubleshooting 7. Troubleshooting Description Description Diagnosis & Solution Error Diagnosis & Solution Error The temperature of BMS is too high. Different type of BMS. BMS type High Let BMS cool down to normal Restart BMS; ■ ■ BMS_Type_Unmatch matching error BMS_TemHigh temperature of temperature and restart;...
  • Page 29: Decommissioning

    7. Troubleshooting 8. Decommissioning Decommissioning Description Error Diagnosis & Solution BMS sampling fault. Dismantling the Battery Disconnection Restart BMS; ■ BMS_Break fault of BMS Contact the Company's after-sales Shutting down the battery unit ■ personnel. Disconnect the cables between the BMS and inverter; ■...
  • Page 30: Maintenance

    9. Maintenance 10. Disclaimer Maintenance Disclaimer Triple Power protects this product under warranty when it is installed and used as If the ambient temperature for storage is -4°F~122°F/-20℃~50℃, recharge the ■ listed in this manual. Violation of the installation procedure or use of the product in batteries at least once every 3 months.
  • Page 31 Warranty Registration Form For Customer (Compulsory) Country Name Phone Number Email Address Zip Code State Product Serial Number Date of Commissioning Installation Company Name Installer Name Electrician License No. For Installer Module ( If Any ) Module Brand Module Size(W) Number of String Number of Panel Per String Battery ( If Any )
  • Page 32 PLEASE REGISTER THE WARRANTY IMMEDIATELY AFTER INSTALLATION! GET YOUR WARRANTY CERTIFICATE FROM SOLAX! KEEP YOUR INVERTER ONLINE & WIN SOLAX POINTS! Open your Wait for the camera app camera to and point recognize your device the QR code at the QR code Notification Click the notification banner...

This manual is also suitable for:

T-bat-sys-hv-r3.6Tbms-mcr0800Tp-hr25Tp-hr36

Table of Contents