Download Print this page

Insignia KY004 Series Installation Manual page 10

Infrared sauna

Advertisement

www.insigniashowers.com
Last Modified: 03/10/2023
Step 4 — Connecting the Heater Wires
Once the bench panel is in place, locate the splitter cable in
the screw bag & connect the heater wires as shown in the dia-
gram. Attach the earth cable on the pre fitted nut & bolt.
10

Advertisement

loading