Page 1
www.insigniashowers.com Last Modified: 07/10/2021 INSTALLATION MANUAL KY1500 Sauna Series 30 Day Technical Support: Call 01908 317512 and request technical support for aiding your installation. Replacements Parts: Inside of your warranty period visit: https://www.insigniashowers.com, click support and make a warranty claim. Spares/Replacements Parts: Outside of your warranty period visit https://www.insigniashowers.com/replacement-parts.html...
Page 2
www.insigniashowers.com Last Modified: 07/10/2021 Contents Thank you for your purchase Electrical & Tool requirements Box contents Side Panel Connection Left Side Panel to Back Panel Connection Floor Positioning Heater Cover Install Seat Install Right Side Panel Connection Front Frame Install Door Handle Install Roof Install and Electrics Connections Screwing the Roof into Position...
Page 3
Last Modified: 07/10/2021 Thank you for your recent purchase of an Insignia Sauna. Please read this booklet with great care to ensure you get the best out of your build and have a Sauna that will last for many years to come! Like everything, in order to obtain a first class product that will serve you well for many years, the effort and correctness put into the assembly will reflect in the quality of your finish.
Page 4
www.insigniashowers.com Last Modified: 07/10/2021 Electrical Requirements Model KY1500 Tools Required Voltage Rating 220-240AC • Scissors Frequency Rating 50Hz • Knife Power Rating 3513 Watts • Spirit Level Amperage 14.64 Amps • Tape Measure • Philips Screwdriver Always consult a qualified Electrician before connection as to suitability •...
Page 5
Door Handle Heater Guard Screw Pack VERY IMPORTANT Have you got everything? If not please contact the Insignia directly on 01908 317 512. Remember NEVER book your tradesman until everything has arrived, been checked and is present. No replacement/missing parts can be obtained free of charge during or after the build.
Page 6
www.insigniashowers.com Last Modified: 07/10/2021 Step 1 — Placing the side panel pieces together 20 x 60mm Screws The cut-outs are for the top of the panel, for the wires to slot through to the roof. Slide the two panel pieces together and slot the top and bottom wood securing pieces in position.
Page 7
www.insigniashowers.com Last Modified: 07/10/2021 Step 2 — Left side panel and back panel connection Lift the side panel, locate fixings and once connected, push down to secure into position.
Page 8
www.insigniashowers.com Last Modified: 07/10/2021 Step 3 — Slide the floor into position Ensure the plate heaters are towards the front. Remove the wood securing it in position for transit and the packaging.
Page 9
www.insigniashowers.com Last Modified: 07/10/2021 Step 4 — Installing heater covers 8 x 50mm Screws Connect the lights then align the heater cover using a spirit level and connect screw in position using ST50 Screws Do this for both sides.
Page 10
www.insigniashowers.com Last Modified: 07/10/2021 Step 5 — Installing the seats 16 x 30mm Screws...
Page 11
www.insigniashowers.com Last Modified: 07/10/2021 Step 6 — Installing seats continued Firmly push all rubber hoses together...
Page 12
www.insigniashowers.com Last Modified: 07/10/2021 Step 7 — Seat Electrics Connect all power from under both seats and then slide into position.
Page 13
www.insigniashowers.com Last Modified: 07/10/2021 Step 8 — Right Side Panel Installation Lift the side panel, locate fixings and once connected, push down to secure into position.
Page 14
www.insigniashowers.com Last Modified: 07/10/2021 Step 9 — Front Frame Installation Lift the front frame, locate fixings and meet with each side panel then push down to secure into position.
Page 15
www.insigniashowers.com Last Modified: 07/10/2021 Step 10 — Installing the door handle and seals...
Page 16
www.insigniashowers.com Last Modified: 07/10/2021 Step 11 — Installing the roof and connecting power...
Page 17
www.insigniashowers.com Last Modified: 07/10/2021 Step 12 — Securing the Roof into Position 14 x 60mm Screws...
Page 18
www.insigniashowers.com Last Modified: 07/10/2021 Step 13 — Securing the Wires to the Roof 20 x 12mm Screws...
Page 19
www.insigniashowers.com Last Modified: 07/10/2021 Control Panel Instructions KY1500 (KY0721 BT Panel) Button 1/2 (Sauna Heaters) Press to activate Sauna heaters. Pressing once will put the heaters on at 100%. Twice = 90%. Three times = 80%. Four times = 70% and five times = Off. Button 3(Lights) Press to cycle through the coloured lights.
Page 20
www.insigniashowers.com Last Modified: 07/10/2021 Chair Remote...
Page 21
www.insigniashowers.com Last Modified: 07/10/2021 Sauna Usage & Safety Guide Never leave children unattended in the Sauna. Regulate the temperature of sauna before session - Pre-heat time 15-30 minutes (from room temperature 20c) Never touch the heater panels whilst in operation, possible burning may occur. Recommended time of use 15-20 minutes per session Stay hydrated during each Sauna session.
Page 22
(EEE) have to fulfil certain obligations. Under the WEEE directive Insignia is considered the producer of certain products we supply and in line with the demands of the legislation we are pleased to offer the op- portunity to return these products to us for treatment and recycling.
Page 23
www.insigniashowers.com Last Modified: 07/10/2021...