App Remote Operation - Energy I1000-RH1 Series User Manual

3kw / 3.68kw / 5kw / 6kw single phase, 2 mppts high voltage hybrid inverter
Table of Contents

Advertisement

6.3.5.System Switch
Press up or down button to turn on or turn off the inverter. Press 'OK' to confirm.
6.3.6. About
This interface shows the information of the inverter, such as series number and software version.
=====Menu=====
Setting
SysSwitch
>About
6.3.7. Self-Test in accordance with CEI 0-21 (Applies to Italy only)
The self-test is only required for inverters, which are commissioned in ltaly. The ltalian standard requires
that all inverters feeding into the utility grid are equipped with a self-test function in accordance with
CEl 0-21. During the self-test, the inverter wil consecutively check the protection reaction times and
values for overvoltage, under voltage, over frequency and under frequency.
Self-test function is available at any time. It also allows end user get test reports shown on LCD display.
Note: Users need to set the inverter country to CEI 0-21 before testing.
Auto-Test from screen:
Normal
Power:
W
XX-XX XX:XX:XX
==User Verify==
0 0 0 0
OK

6.4 APP remote operation

For some functions setting, the end user can achieve them through APP remotely.Such as power
factor,reactive power, DRM0 and so on.
Please refer to the user manual of WIFI module for more details about configuration and power
plant creating.
=====Menu=====
History
Setting
>SysSwitch
=====About=====
Model:
I1000-RH1-6k-M1
=====About=====
M Ver: Vx.xx
S Ver: Vx.xx
H Ver: Vx.xx
=====Settings=====
=====Menu=====
PV Config
Status
Comm Addr
History
>Advanced*
>Settings
===Advanced*===
====On-Grid====
>On-Grid
>Safety
Feature
Grid
New Password
Export Control
====SysSwitch====
>Turn On
OK
=====About=====
InverSN:
123456789abcdefg
=====About=====
BMS M Ver: Vx.xx
BMS S Ver: Vx.xx
====Safety====
>CEI0-21
OK
33
====On-Grid====
Grid
Export Control
>Self Test