Installation Of Remote Control Switch; Earthing Work; Trial Run And Operation; Installations Test Check Points - Mitsubishi Heavy Industries SRK19CSS-S3 User's Manual & Installation Manual

Table of Contents

Advertisement

Installation of remote control switch

Mounting method of battery
Uncover the remote control switch, and mount the batter-
ies [R03(AAA, Micro)×2 pieces] in the body regularly.
(Fit the poles with the indication marks, , & . without
fail)
Battery
+
-
-
+
Cover

Earthing work

Earth work shall be carried out without fail in order to prevent electric shock and noise generation.
The connection of the earth cable to the following substances causes dangerous failures, therefore it shall never be done.
City water pipe, Town gas pipe, TV antenna, lightning conductor, telephone line, etc.

Trial run and operation

1 Conduct trial run after confi rming that there is no gas leaks.
2 When conducting trial run set the remote control thermostat to continuous operation position. However when the power source is
cut off or when the unit's operation switch is turned off or was turned to fan operation position, the unit will not go into operation
in order to protect the compressor.
3 Explain to the customer on the correct usage of the air-conditioner in simple layman's terms.
4 Make sure that drain fl ows properly.

Installations test check points

Check the following points again after completion of the installation, and before turning on the power. Conduct a test run again and
ensure that the unit operates properly.
At the same time, explain to the customer how to use the unit and how to take care of the unit following the instruction manual.
After installation
The power source voltage is correct as the rating.
No gas leaks from the joints of the operation valve.
Operation valve is fully open.
The pipe joints for indoor and outdoor pipes have been
insulated.
(Three-minute restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit will not start operating for approximately 3 minutes.
This is to protect the unit and it is not a malfunction.
RMA012A105G_J-L_RevC_EN.indb 35
RMA012A105G_J-L_RevC_EN.indb 35
CAUTION
Do not use new and
old batteries together.
Test run
– 35 –
Fixing to pillar or wall
Conventionally, operate the wireless remote control by
holding in your hand.
Avoid installing it on a clay wall etc.
Screws
Air conditioning operation is normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
The remote control is normal.
Operation of the unit has been explained to the customer.
12/6/2018 11:48:26 AM
12/6/2018 11:48:26 AM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk25css-s3

Table of Contents