(4) Insulation of connecting portion
1 Cover the connection portion of the refrigerant piping
with the pipe cover and seal them.
If neglecting to do so, moisture occurs on the piping and
water will drip out.
2 Finishing and fixing
a
Tie up the piping with wrapping tape, and shape it so that it
conforms to which the pipe is attached.
b
Fix them with clamps as right figure.

5.5 Installation of remote control switch

(1) Mounting method of battery
¡ Uncover the remote control switch, and mount the batteries
(UM-4 × 2 pieces) in the body regularly.
(Fit the poles with the indication marks, , & . without fail)

5.6 Earthing work

¡ Earth work shall be carried out without fail in order to prevent electric shock and noise generation.
¡ The connection of the earth cable to the following substances causes dangerous failures, therefore it shall never be done.
City water pipe, Town gas pipe, TV antenna, lightning conductor, telephone line, etc.

5.7 Trial run and operation

1 Conduct trial run after confirming that there is no gas leaks.
2 When conducting trial run set the remote controller thermostat to continuous operation position. However when the power
source is cut off or when the unit's operation switch is turned off or was turned to fan operation position, the unit will not go
into operation in order to protect the compressor.
3 Insert in electric plug into the electric outlet and make sure that it is not loose.
a When there is something wrong with the electric outlet and if the insertion of the electric plug is insufficient, there may
occur a burn out.
b It is very important to be careful of above when pulgging in the unit to an already furnished electrical outlet.
4 Explain to the customer on the correct usage of the air conditioner in simple layman's terms.
5 Make sure that drain flows properly.
6 Standard operation data.
Item
Low pressure MPa (kgf/cm
Temp. difference between return
air and supply air (˚C)
Running current (A)
Note (1) The data are measured at following conditions
Ambient air temperature
Indoor side: 27°C DB, 19°C WB
Outdoor side: 35°C DB, 24°C WB
Model
SRK06CC-1, 06CC-4 SRK07CC-1, 07CC-4 SRK09CC-1, 09CC-4 SRK12CC-1, 12CC-4
2
)
0.4 ~ 0.5 (4 ~ 5)
12 – 17
4.3/4.6
-
To cover the connecting portion with insula-
tion materials, cut upper portion and then seal
Vinyl tape
it with insulation materials.
Insulation
Refrigerant piping
Electrical wiring
Covering tape
Drain hose
Tapping screw
3 Battery
0.4 ~ 0.5 (4 ~ 5)
0.4 ~ 0.5 (4 ~ 5)
12 – 17
4.3/4.7
56
-
Cover the exterior portion with cov-
ering tape and shape the piping so it
will match the contours of the route
that the piping to take. Also fix the
wiring and pipings to the wall with
clamps.
Cover
220/240V
0.4 ~ 0.5 (4 ~ 5)
11 – 16
13 – 17
4.4/4.8
6.4/6.8