Installing The System Into A Rack; Identifying The Sections Of The Rack Rails - Supero 1122GG-TF User Manual

A+ server
Table of Contents

Advertisement

A+ Server 1122GG-TF User's Manual
2-5

Installing the System into a Rack

This section provides information on installing the SC818G chassis into a rack unit
with the rails provided. There are a variety of rack units on the market, which may
mean that the assembly procedure will differ slightly. You should also refer to the
installation instructions that came with the rack unit you are using.
Note: This rail will fit a rack between 26" and 33.5" deep.

Identifying the Sections of the Rack Rails

The chassis package includes two rack rail assemblies in the rack mounting kit. Each
assembly consists of two sections: an inner fixed chassis rail that secures directly to
the server chassis and an outer fixed rack rail that secures directly to the rack itself.
Figure 2-1. Identifying the Sections of the Rack Rails
Inner Rail (preattached
to the chassis)
2-4
Inner Rail
slide together, then
Extension:
attach to the
chassis
Brackets: attach to
Outer Rails:
attach to the front
and rear brackets
Front and Rear
the rack

Advertisement

Table of Contents
loading

Table of Contents