Trane GAM5B0A18M11EB Installation, Operation And Maintenance Manual page 18

Convertible air handlers
Table of Contents

Advertisement

Plenum Installation
1. Assemble the plenum using the plenum's
Installer Guide.
On units with sheet metal returns: Return plenum
must be flanged. Sheet metal drill point screws
must be 1/2" in length or shorter.
7.3 Downflow Installation
• Downflow installation must comply with national,
state, and local codes.
• The air handlers are rated for zero clearance from
combustible materials.
STEP 1 - Prepare the location site as appropriate for
your application and per national, state, and local code
requirements.
STEP 2 - Set the unit in position.
18
Typical Plenum Installation
Representative Illustration
Typical Downflow Installation
Airflow

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents