Leak Testing Of Containment System; Recommended Test Setup For Calomat 6F, Calomat 62F And Oxymat 6F - Siemens 7MB2531 Operating Instructions Manual

Continuous gas analysis
Table of Contents

Advertisement

Commissioning

5.2 Leak testing of containment system

5.2
Leak testing of containment system
5.2.1

Recommended test setup for CALOMAT 6F, CALOMAT 62F and OXYMAT 6F

2, 4
Connections of sample gas path
11, 12
3
Connection of reference gas (if present)
21
BI
Blanking plug
Figure 5-1
Recommended test setup for CALOMAT 6F, CALOMAT 62F and OXYMAT 6F
Install the test setup as follows:
1. Close the sample gas outlet
2. If the analyzer has a reference gas connection, also close its inlet
3. Install a suitable shutoff valve (e.g. needle valve V1) of sufficient tightness into the sample
gas line upstream of the sample gas inlet
4. Connect a pressure regulator with a measuring range of 200 kPa (OXYMAT 6F) or 50 kPa
(CALOMAT 6F) and a resolution of 0.1 kPa upstream of the shutoff valve V1.
46
M
Manometer (gauge pressure)
PR
Pressure regulator
V1
Shut-off valve (leak rate < 10
using a blanking plug.
.
Compact Operating Instructions in accordance with EN 61010-1 and EN 60079-0
Compact Operating Instructions, 09/2018, A5E45779389002-01
kPa*l/s)
-6
using a blanking plug.

Advertisement

Table of Contents
loading

Table of Contents