Download Print this page
TMG -ST2041V Product Manual

TMG -ST2041V Product Manual

20 x 40 ft straight wall storage shelter

Advertisement

Quick Links

▶ W W W . T M G I N D U S T R I A L . C O M
P 0 / 1 9
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

Advertisement

loading
Need help?

Need help?

Do you have a question about the TMG-ST2041V and is the answer not in the manual?

Questions and answers

Summary of Contents for TMG TMG-ST2041V

  • Page 1 ▶ W W W . T M G I N D U S T R I A L . C O M P 0 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 2: Main Specifications

    Main Specifications : Overall assembled size : W6 x L12 x H3.65 (m) / 19.68 x 39.37 x 11.97 (ft) Shoulder height : 2 (m) / 6.56 (ft) Front and rear roll up door : 3 x 3 (m) / W9.84 x H9.84 (ft) Prior to assembly Please read the instructions carefully before installation.
  • Page 3 Keep the building surroundings clear at all times. TMG-ST2041V Part List Parts Graphical Description length code φ48xL1820mm Peak arch tube Upper rafter tube φ48xL1934mm (middle truss) Upper rafter tube φ48xL1934mm (front truss) Shoulder tube φ48xL1123mm (middle truss) Shoulder tube φ48xL1123mm (front and rear truss) φ48x1480mm...
  • Page 4 Right corner baseplate W200xL350mm (front and rear truss) Door column baseplate W150xL200mm (front truss) Middle truss baseplate W150xL200mm Ratchet Door frame lower tube φ48xL1980mm (front and rear truss) Door frame upper tube φ48xL1405mm (front and rear truss) Door frame horizontal φ42xL1446mm tube (front and rear truss)
  • Page 5 Expansion bolt φ14x100mm (not included) Half round head bolt M8x60mm Hex Bolt M10x70mm Hex Bolt M10x30mm Hex Bolt M10x50mm φ8xL12m Nylon rope φ32mm Water plug Top cover Front cover panel φ8xL180m Braided rope 1 bundle Ratchet straps W38xL800mm Scratch resistant tape ▶...
  • Page 6 Step 1 : Base plates installation.  Installation diagram of expansion bolt. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 5 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 7 Step 2 : Install front and rear truss. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 6 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 8 Step 3 : Install the middle truss. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 7 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 9 Step 4 : Wrap (#26) around the sharp points of the joint to avoid friction between the fabric and the interface. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 8 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 10 Step 5 : Put up the front and rear truss and the intermediate trusses. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 9 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 11 Step 6 : Install (#5) roof purlin. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 0 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 12 Step 7 : Install the diagonal bracing bars (#13). Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 1 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 13 Step 8 : Install the remaining parts on the front and rear trusses. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 2 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 14 Step 9 : Install front and rear cover panel.  Lift up (#23) cover panels, starting from the center point of the frame (highest ridge point) ,use ropes (#24) Center point through the grommets to tie the panel to the truss firmly. Then continue from the middle to the sides to tie the panels to the arch pipe.
  • Page 15 What you see in this photo is outside  The rope coming out from pulley11B must go through the upper wheel of pully 11A, then pull both ropes together slowly and start to lift the door cover.  Tie both ropes to the corner baseplate. Now the door cover is up. When you drop down the door cover, do not let go too quick, otherwise it might get stuck and damage the fabric.
  • Page 16 Step 10 : Install the top cover (#22) stretch and tighten top cover. Do not install the cover during windy weather!  Stretch and adjust the cover from back and forth, to make sure it is square and centered.  Unpack the top cover and place it along one of the long sides of the structure.
  • Page 17 Part Qty NO. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 6 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 18 Step 11 : Tension the cover on the structure from both sides. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 7 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 19 Step 12 : Install ratchet straps. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 8 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 20 After the Installation Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position. Check the base plates, adjust the ropes and tie downs if required and clean the cover regularly.