HADEF 190/94 Installation, Operating And Maintenance Instructions page 12

Stainless steel wire rope winch
Table of Contents

Advertisement

12.3
Inspection intervals
Inspection of the equipment by a qualified person (periodic
inspection)
Check screw connections
Check brake function
check brake air gap (only for electric devices) *)
check overload protection if existent
clean and lubricate the wire rope
check wire rope and wire rope end fastenings for damage
and wear
check the load tackle and load hook for cracks and
deformation
*) not for EX design
13
Service
13.1
Wire rope
Wire ropes have to be exchanged by new, original wire ropes if they show corrosion, fracture or if they are
worn.
Checks:
Fastening screws must be checked before commissioning and at least every 3 months, - tighten them if
necessary.
Kind and number of broken threads.
Position of the broken threads
Timing sequence of occurrence of breaks.
Reduction of the wire rope diameter.
Corrosion
Abrasion
Deformation
Heat influence
Operation time
Wire rope fastening
CAUTION!
The wire rope must be replaced immediately should even one strand be broken.
13.2
Gearing
The gearing is actually filled with high-quality long term lubricant. Bearings are fitted with maintenance-free
slide-bearings.
For use as directed and normally, the greasing is sufficient for approx. 5 years.
For extremely use, e.g. dust, wetness, or any thing else, change worn out parts and lubricate the gearing
parts with grease.
13.3
Lubricant - Selection
FUCHS
SHELL
Renolit FEP 2
Alvania EP 2
Stabylan 5006
--
--
--
13.4
12
on commissioning
X
X
X
ESSO
MOBIL
Unirex EP 2
Mobilux EP 2
--
--
--
--
Chain lubricant OKS 451
daily checks
1st service after 3
months
X
X
X
TOTAL
CASTROL
MULTIS EP2
--
--
Optimol Viscoleb 1500
--
--
inspection,
inspection,
service every 3
service every 12
months
months
X
X
X
X
X
X
KLÜBER
--
Klüberoil 4UH 1-1500
Wolfracoat 99113
5.52.248.00.01.02

Advertisement

Table of Contents
loading

This manual is also suitable for:

192/98

Table of Contents