ACS
Siemens
Smart Infrastructure
The application and control parameters can be adjusted and downloaded.
Column Line no. contains the parameter number as shown in the parameter
table (see section 3.11).
5.2.2
Operation and monitoring with ACS
In the ACS tool, select Plant, then Open to open the plant.
To start monitoring and operation, select Applications, then Plant operation –
Standard popcard
RDG400KN,RDG405KN Basic documentation
77 / 86
CE1P3192en
2019-04-12