Westinghouse WVE9516DD User Manual page 15

Hide thumbs Also See for WVE9516DD:
Table of Contents

Advertisement

INSTALLATION OF THE APPLIANCE (CONTINUED)
Slot-in installation (continued)
• The anti-tilt brackets are to be secured to the back
wall with appropriate fasteners.
• Two stops are to be screwed to the plinth in
locations as shown (stops provided). The stops
locate into slots in the base of the appliance to
prevent the product from being pulled forward
when installed.
• Measurements from the rear wall are to be adjusted
if there are tiles etc. that come between the
appliance and the wall.
104
165
C L
104
370
370
165
344
344
Location of holes
for front stops
Measurements are to be adjusted to account for the thickness of any skirting
board or tiles coming between the back of the appliance and the wall
• Once services are connected, product can be lifted
onto the plinth and pushed back carefully, ensuring
the appliance engages into both brackets at the rear
and the front stops.
• If the product requires removal for service, it must
be lifted at the front approximately 5mm to clear the
front stops prior to being pulled forward.
+
+
+
+
+
Front stops
Front stops
+
+
+
+
+
INSTALLATION OF THE APPLIANCE
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wfe9516dd

Table of Contents